Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/01/2012 | MARTIN BROWN | FIRE | REVIEW | Approved | |
03/08/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | GENERAL 1. There are several sheets of the submittal package that have lettering font sizes smaller than that of the COT required standard of 3/32" minimum both upper and lower case. This includes architectiural, structural mechanical, plumbing and electrical sheets. Please adjust all non-compliant sheets and resubmit. 2. The certified letter of appeal for occupancy reduction to the building official is not included with this submittal package. This review can not be complete until this appeal has been presented and judicated. Major building code perameters are contingent upon the actual occupancy load quantities. 3. Please submit an existing site plan showing: a. All spaces occupied by the school b. The area of the existing building that has been demolished because of the fire. c. Please provide a s.f. summary of the existing building area distroyed subtracted from the area of the new building addition showing a plus or minus overall difference. SHEET C1.1 4. At detail 1: Detectable warning strips are not required at access to the accessible parking aisle. This area is a safe zone. SHEETS C1.0, 2of5, 3of5, 4of5 AND A2.2 5. Door number 83 requires an exterior landing/stoop as per the 2006 IBC, Section 1008.1.4. These landings can not be in the PAAL, reference Zoing requirements. 5. Please extend the accessible route to the Studio and include a marked crossing with all required curb ramps and detectable warning strips. SHEET A2.4 6. For all toilet plans, please provide all required accessible dimensions, clearances accessories and fixtures. 7. For all toilet elevations, please provide all required accessible dimensions, clearances accessories and fixtures. SHEET A4.0 8. Finish detailing all the roof plans and provide key note reference marks. SHEET A6.1 9. Change "ADA Compliance" to "ICC A117.1, 2003 Edition Compliance". END OF REVIW |
03/13/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide energy code compliance calculations for the building envelope; use the climate zone for Pima County < 4,000 feet. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. 2. Clarify key note 10 on sheet M1.1; it appears to be missing on the drawing and the dryer exhaust that is shown does not appear to comply with the length limitations of Section 504.6.1, IMC 2006. 3. Clarify key note 4 on sheet M1.1. Reference: Section 106.3.1, IMC 2006. 4. Clarify keynote 7 on sheet M1.2; where is the Big Ass fan shown on the drawings. Provide structural details showing how the fan is connected to the building structure. Reference: Section 106.3.1, IMC 2006. |
03/14/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The water calculations are based on Appendix A, UPC 2006 but the fixture units used for the water closets are for tank-type units and not the specified flush valve water closets. Revise the fixture units and use the correct demand curve from Chart A-3, UPC 2006. Include hose bibbs when determining the total number of fixture units. Revise the size of the proposed water meter as required to accommodate the recommended maximum continuous flow per AWWA Standard C700-90. Reference: Section 604.1, IPC 2006. 2. Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves (e.g. clothes washer). Reference: Section 604.9, IPC 2006. 3. Verify the material used for the portion of the existing building sewer that will be located below the new building is intact and suitable for use under the building. Reference: Section 703.4 and Table 702.2, IPC 2006. 4. Clarify detail 1/P4.1 with respect to the field-fabricated two-way cleanout assembly. A two-way cleanout is only allowed to be used at the junction of a building drain and a building sewer; not in the middle of a building drain. Reference: Sections 708.3.5 and 708.5, IPC 2006. 5. Show that the building drain has cleanouts located at least every 100 feet. 6. Provide traps for the trench drains. Reference: Section 1002.1, IPC 2006. 7. The roof plan keynotes call out a roof drain and an overflow drain; where are they located? |
03/14/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
03/15/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T12CM00498 8250 E 22nd ST School, 37,453 SF 1. Submittal Requirements , all lettering (small and large case) to br minimum 3/32" for all electrical sheets. Same requirement made per Structural and Building Plans Ex. 2. City of Tucson Outdoor Lighting Calculations, only 12 SB type fixtures used, the mezzanine has an additional 8 SB fixtures making total 20. Ray T Majuta PDSD, C of Tuc, Electrical Plns CK 3/21/12 Ray.majuta@tucsonaz.gov |
03/21/2012 | GERRY KOZIOL | WWM | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/28/2012 | FERNE RODRIGUEZ | OUT TO CUSTOMER | Completed |