Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T12CM00405
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/20/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | COMMENTS 2, 3, 4 AND 16. 1. Awaiting judication of Appeal to the Building Official before final interperation/comment and/or approval of these comments can be made. COMMENT 16 2. As per the calculations on sheet G1.2, a total of 5 drinking fountains are required; 3 for education, 1 for business and 1 for assembly. It is further indicated that only four are provided. Is this noncompliant to that as required? a. Why were the water foundations located out side Science Room #312 deleted on sheets G 1.2, A1.1 and P1.1. Doesn't this reduced the number of water fountains below that shown as "provided" and "required" on sheet G1.2? b. The exact number of water foundations required by code will be determined after comment 1 above has been resolved. END OF REVIEW |
03/21/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Revise the envelope energy calculations to coordinate with the new U-value and SHGF information shown on the wall section drawings. No continuous insulation is called out. [Original comment: Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors and solar heat gain coefficients (SHGC) of the envelope systems and fenestration components, along with the R-values of the insulation. Note the locations of the continuous insulation for the roof and exterior walls on the drawings. Reference: Section 104.2, IECC 2006.] |
03/21/2012 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
03/22/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a tepid water to the emergency eyewash/shower, P-9, per ISEA Z358.1. Reference: Section 411.1, IPC 2006. 2. Comment not resolved; no structural or architectural details for the support of the water heater were found. Reference: Section 305.3, IPC 2006. [Original comment: Provide structural details showing how the mounting shelf for water heater WH-3 is to be connected to the building structure. Reference: Sections 310.0 and 314.5, UPC 2006.] 3. The design for the installation of the neutralization tanks (detail 1/P2.1) shows no vent for the neutralization tank prior to the air admittance valve; fumes created when the acid waste combines with the limestone chips necessarily are introduced to the waste piping downstream of the air admittance valve. The submitted manufacturer's information sheet states, "The valve should not be installed as a vent terminal for any special (chemical) waste system or in supply or return air plenums." Reference: Sections 803.2, 917.7, and 917.8, IPC 2006. [Original comment: Provide listing information for the acid neutralization tanks that clarifies the installation requirements of the tanks with respect to venting as well as information for the air admittance valves that shows the proposed installation conforms to their listing. Reference: Sections 103.2.3 and 310.4, UPC 2006.] 4. Clarify the roof area labels; two discontinuous areas are labeled as F. Verify the size of the gutters serving areas G and C comply with the requirements of Table 1106.6, IPC 2006 when all of the contributing areas are included. Include the effect of vertical walls as shown in Section 1106.4, IPC 2006. [Original comment: Provide a key plan correlating the roof drainage areas (A through K) with the roof plan. Reference: Section 103.2.3, UPC 2006.] |
03/23/2012 | GERRY KOZIOL | WWM | REVIEW | Denied | DOES NOT MATCH REVISED FOUNDATION DRAWING T11CM03933-R1 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/02/2012 | CPIERCE1 | APPROVAL SHELF | Completed |
04/02/2012 | CPIERCE1 | OUT TO CUSTOMER | Completed |
04/02/2012 | GERARDO BONILLA | REJECT SHELF | Completed |