Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM00378
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/13/2012 | JASON GREEN | ENGINEERING | REVIEW | Approved | Will stamp building plan approved once the DP12-0019 is approved. No Flooplain issues there for no issues with the buildings. |
04/13/2012 | MARTIN BROWN | FIRE | REVIEW | Denied | Gate into parking lot should be 20' wide. Please refer to C.O.T. modifications to the 2006 IFC, section 503.6.2. |
04/13/2012 | JASON GREEN | ENGINEERING | REVIEW | Approved | Approved 13MAY13. JG |
04/17/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | GENERAL 1. Please provide structural calculations for: 1. Light Pole Foundations, 2. Wrought Iron Fencing and Gates SHEET OQ2-S1.1 2. Please provide certification of the special inspectors selected to conduct the special inspexctions as outlined. SHEET OC1-A1 AND STRUCTURAL CALCULATIONS 3. The calculations call for an extensive roof framing structure and foundation plan whereas the drawings show only to preserve and restore exting adobe ruins. Please clearify. SHEET OQ2-S2.1 4. No structural calculations are included for the 6x6x5/16 steel columns columns shown on the drawings atop HP2. Please reconcile. END OF REVIEW |
04/18/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
04/18/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide roof drainage calculations for OQ-3. Show that the circular scuppers and canales are capable of providing adequate drainage for the roof. Note that Section 1107.3, IPC 2006 requires a minimum opening size of 4" - typically a rectangular opening. Reference: Sections 1101, 1106 and 1107, IPC 2006. 2. Provide overflow protection for the roof of OQ-3 or provide structural calculations to show that the roof is capable of supporting the additional rain load if the primary roof drains are blocked for any reason. Reference: Sections 1101, 1106 and 1107, IPC 2006 and Section 1611.1, IBC 2006. 3. Clarify the number and locations of the downspouts for the gutters on the roof for OQ-2. Reference: Section 106.3.1, IPC 2006. |
04/18/2012 | ROBERT SHERRY | WATER | REVIEW | Passed | |
04/20/2012 | TERRY STEVENS | ZONING | REVIEW | Denied | Zoning cannot approve the building plan until the development package has been approved. |
05/03/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T12CM00378 5450 E Fort Lowell (Park) 1. The electrical sheets are marked "Preliminary Not for Construction". Cannot approve or stamp with this on plans. 2. Electrical sheets to be sealed by Electrical Engineer. Ray T Majuta Elect Plan Review PDSD, C of Tucson 5/3/12 Ray.Majuta@tucsonaz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/22/2013 | CPIERCE1 | OUT TO CUSTOMER | Completed |
03/22/2013 | CPIERCE1 | REJECT SHELF | Completed |