Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T12CM00378
Parcel: 11009032B

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T12CM00378
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/13/2012 JASON GREEN ENGINEERING REVIEW Approved Will stamp building plan approved once the DP12-0019 is approved. No Flooplain issues there for no issues with the buildings.
04/13/2012 MARTIN BROWN FIRE REVIEW Denied Gate into parking lot should be 20' wide. Please refer to C.O.T. modifications to the 2006 IFC, section 503.6.2.
04/13/2012 JASON GREEN ENGINEERING REVIEW Approved Approved 13MAY13. JG
04/17/2012 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied GENERAL
1. Please provide structural calculations for: 1. Light Pole Foundations, 2. Wrought Iron Fencing and Gates
SHEET OQ2-S1.1
2. Please provide certification of the special inspectors selected to conduct the special inspexctions as outlined.
SHEET OC1-A1 AND STRUCTURAL CALCULATIONS
3. The calculations call for an extensive roof framing structure and foundation plan whereas the drawings show only to preserve and restore exting adobe ruins. Please clearify.
SHEET OQ2-S2.1
4. No structural calculations are included for the 6x6x5/16
steel columns columns shown on the drawings atop HP2. Please reconcile.
END OF REVIEW
04/18/2012 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed
04/18/2012 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide roof drainage calculations for OQ-3. Show that the circular scuppers and canales are capable of providing adequate drainage for the roof. Note that Section 1107.3, IPC 2006 requires a minimum opening size of 4" - typically a rectangular opening. Reference: Sections 1101, 1106 and 1107, IPC 2006.
2. Provide overflow protection for the roof of OQ-3 or provide structural calculations to show that the roof is capable of supporting the additional rain load if the primary roof drains are blocked for any reason. Reference: Sections 1101, 1106 and 1107, IPC 2006 and Section 1611.1, IBC 2006.
3. Clarify the number and locations of the downspouts for the gutters on the roof for OQ-2. Reference: Section 106.3.1, IPC 2006.
04/18/2012 ROBERT SHERRY WATER REVIEW Passed
04/20/2012 TERRY STEVENS ZONING REVIEW Denied Zoning cannot approve the building plan until the development package has been approved.
05/03/2012 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied T12CM00378
5450 E Fort Lowell (Park)

1. The electrical sheets are marked "Preliminary Not for Construction". Cannot approve or stamp with this on plans.
2. Electrical sheets to be sealed by Electrical Engineer.

Ray T Majuta
Elect Plan Review
PDSD, C of Tucson
5/3/12
Ray.Majuta@tucsonaz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
03/22/2013 CPIERCE1 OUT TO CUSTOMER Completed
03/22/2013 CPIERCE1 REJECT SHELF Completed