Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 2ND
Permit Number - T12CM00376
Review Name: REVISION - - 2ND
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/17/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | The submitted natural gas calculations and gas pipe riser diagram are not coordinated. Nine of the nodes shown in the calculations do not exist on the gas riser diagram, eight nodes shown on the diagram are not in the calculations, eleven individual loads (e.g. RTUs) are connected to different nodes, and the diagram shows two "Future 4" loads but no "Future 5" load. [Original comment: Provide natural gas pipe sizing calculations (i.e. provide a revision of sheet P6). Reference: Section 401.8, IFGC 2006.] |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/25/2012 | CINDY AGUILAR | REJECT SHELF | Completed |