Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T12CM00334
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/04/2012 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 04/04/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 04/04/2012 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 04/04/2012 | RONALD BROWN | ADA | REVIEW | Passed | |
| 04/05/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Comment not resolved; the detail on sheet P3.00 does not show how the platform is to be attached to the partition and no structural calculations have been supplied to show that the 357-pound load can be supported by the partition. [Original comment: Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006.] 2. Coordinate the architectural and plumbing designs: sheet A3.00 shows 4" wide x 3" deep gutters with 2" x 3" downspouts but sheet P1.03 refers to 6" leaders and 6" scuppers. If gutters are to be used, see Table 1106.6, IPC 2006 for the required minimum gutter size and Table 1106.2, IPC 2006 for the minimum required downspout size. [Original comment: Revise the roof gutter and downspout sizing (shown on sheet A3.00) based on a storm of 60-minutes duration and a 100-year return period, i.e. 3" per hour. Use the entire roof area when doing the calculations. Reference: Sections 1106.1, 1106.3 and Table 11-3, UPC 2006.] |
| 04/05/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | When the condensate drains of two or more units are connected, the minimum size of the condensate drain shall be 1". [Original comment: Revise the size of the condensate drains in accordance with Section 307.2.1, IMC 2006, as amended by the City of Tucson.] |
| 04/06/2012 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: O'Rielly Chevrolet - New Used Car Sales Building & Remodel T12CM00333, T12CM00334, T12CM00335, Building Plan (2nd Review) TRANSMITTAL DATE: April 6, 2012 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning can not approve the building plan until the development package has been approved. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
| 04/17/2012 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 05/01/2012 | GERRY KOZIOL | WWM | REVIEW | Denied | NEED 5TH FLOOR CREDIT EVALUATION |
| 05/01/2012 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/22/2012 | CPIERCE1 | OUT TO CUSTOMER | Completed |