Permit Number: T12CM00333
Parcel: 128010230

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T12CM00333
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/04/2012 MARTIN BROWN FIRE REVIEW Approved
04/04/2012 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Clarify the intent of the design for the pumped discharge from the sewage ejector. Keynote 16 on sheet P1.04 refers to a 3" pumped waste connecting to the existing 4" building sewer but the plumbing plan shows a 4" gravity waste line instead of a pumped waste line. Also, how will the section of waste line between the full-way valves of the ejector pumps and the floor cleanout located in the truck service bay be cleaned out? [Original comment: Show how the 3" pumped-discharge of the sewage ejector connects to the 4" gravity drainage line. Reference: Section 710.4, UPC 2006.]
2. The vent for the ejector sump, as shown on detail 1/P2.00 is required but the vent shown on the plumbing plans does not connect to the ejector sump. The vent on the plumbing plan appears to be connected tp the pumped discharge of the ejector pumps. [Original comment: Provide a vent for the sewage ejector sump. Reference: Section 710.10, UPC 2006.]
3. Provide information from the manufacturer of the sand/oil separator that indicates that providing a vent prior to the separator and after the separator will address the original comment. Reference: Sections 303.2 and 1003.9, IPC 2006. [Original comment: Clarify the design of the venting for the oil/sand interceptors; why only one vent at the outlet when oil vapors can collect and be trapped in each compartment? Reference: Section 1016.3, UPC 2006.]
04/04/2012 RONALD BROWN ADA REVIEW Passed
04/04/2012 ROBERT SHERRY WATER REVIEW Approved
04/04/2012 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
04/04/2012 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed
04/04/2012 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
04/06/2012 STEVE SHIELDS ZONING REVIEW Denied PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: O'Rielly Chevrolet - New Used Car Sales Building & Remodel
T12CM00333, T12CM00334, T12CM00335,
Building Plan (2nd Review)

TRANSMITTAL DATE: April 6, 2012

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Zoning can not approve the building plan until the development package has been approved.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
04/17/2012 LOREN MAKUS ENGINEERING REVIEW Denied DP must be approved first.
05/01/2012 GERRY KOZIOL WWM REVIEW Denied NEED WW/WC/ TOM TOMCHAK REVIEW OF SAND/OIL INTERCEPTORS 724-6200 3035 W EL CAMINO DEL CERRO
05/01/2012 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
05/22/2012 CPIERCE1 OUT TO CUSTOMER Completed