Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T12CM00296
Parcel: 115202610

Review Status: Completed

Review Details: RESUBMITTAL - TI ALL

Permit Number - T12CM00296
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/09/2012 ELIZABETH LEIBOLD ENGINEERING REVIEW Denied Building permits may not be issued until the layout and location of the buildings are approved on a stamped-approved Development Package D11-0032.
05/11/2012 MARTIN BROWN FIRE REVIEW Approved
05/16/2012 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied Reference comments on activity number T12CMOO290
05/24/2012 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Comment not addressed. Clarify the identification of fixture P5 for buildings 2 through 10; should it actually be P8? Reference: Section 106.3.1, IPC 2006.
2. Comment not addressed. Revise the size of the "wet-v" shown in details 1 and 3/P2.1 from 2" to 3" if the 3" cleanout is to remain. Reference: Section 704.2, IPC 2006.
05/24/2012 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Comment not addressed. Clarify the ventilation method to be used for dwelling units A and B; the mechanical floor plan implies mechanical ventilation but the fan coil schedule and the ventilation calculations indicate that natural ventilation will be used. Reference: Section 401.2, IMC 2006.
06/01/2012 TERRY STEVENS ZONING REVIEW Denied 02/10/2012

Development Services Department
Zoning Review Section

Terry Stevens
Lead Planner

Comments:

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next building plan submittal.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming.
06/11/2012 GERRY KOZIOL WWM REVIEW Denied - NEED WASTEWATER 3RD FLOOR REVIEW OF LOCATION/METHOD OF CONNECTION TO PUBLIC SEWER CHAD AMATEAU 740-6547
- NEED 1ST FLOOR MANHOLE CONSTRUCTION PERMIT APPROVAL - NEED DEQ REVIEW & APPROVAL TO CONSTRUCT ON SITE PRIVATE SEWER WITH MANHOLES DAVID AMASH 243-7400 33N STONE AV 7TH FLOOR BANK OF AMERICA BLDG - NEED COPY OF PRIVATE SEWER PLANS FOR BASE MAP UPDATE
- NEED PCRWRD/3RD FLOOR CAPACITY REVIEW - KURT STEMM 740-6534