Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T12CM00291
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/09/2012 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Denied | Building permits may not be issued until the layout and location of the buildings are approved on a stamped-approved Development Package D11-0032. |
05/11/2012 | MARTIN BROWN | FIRE | REVIEW | Approved | |
05/16/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | Reference comments on activity number T12CMOO290 |
05/24/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Comment not addressed. Clarify the identification of fixture P5 for buildings 2 through 10; should it actually be P8? Reference: Section 106.3.1, IPC 2006. 2. Comment not addressed. Revise the size of the "wet-v" shown in details 1, 3, and 5/P2.1 from 2" to 3" if the 3" cleanout is to remain. Reference: Section 704.2, IPC 2006. |
05/24/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Comment not addressed. Clarify the ventilation method to be used for dwelling units A and B; the mechanical floor plan implies mechanical ventilation but the fan coil schedule and the ventilation calculations indicate that natural ventilation will be used. Reference: Section 401.2, IMC 2006. |
06/01/2012 | TERRY STEVENS | ZONING | REVIEW | Denied | 02/10/2012 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming. |
06/11/2012 | GERRY KOZIOL | WWM | REVIEW | Denied | - NEED WASTEWATER 3RD FLOOR REVIEW OF LOCATION/METHOD OF CONNECTION TO PUBLIC SEWER CHAD AMATEAU 740-6547 - NEED 1ST FLOOR MANHOLE CONSTRUCTION PERMIT APPROVAL - NEED DEQ REVIEW & APPROVAL TO CONSTRUCT ON SITE PRIVATE SEWER WITH MANHOLES DAVID AMASH 243-7400 33N STONE AV 7TH FLOOR BANK OF AMERICA BLDG - NEED COPY OF PRIVATE SEWER PLANS FOR BASE MAP UPDATE - NEED PCRWRD/3RD FLOOR CAPACITY REVIEW - KURT STEMM 740-6534 |