Review Details: RESUBMITTAL - TI ALL
Permit Number - T12CM00290
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/24/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
07/27/2012 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Approved | |
08/07/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | If PEX is to be allowed as an alternate to schedule 40 CPVC for the water distribution, provide sizing guidance for the contractor based on the pressure calculations shown on sheet P3.2 and the manufacturer's installation instructions. For instance, both a shower and a close-coupled water closet require a minimum flow rate of 3 GPM per Table 604.3, IPC 2006 and the calculations for Building 1 limit the pipe friction to 10.2 PSI/100- feet so ½" PEX tubing cannot be used for those fixtures. [Previous comments: Comment not addressed. Provide a design for the proposed PEX water distribution manifold system. Reference: Section 604.3, IPC 2006.] |
08/07/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
08/16/2012 | GERRY KOZIOL | WWM | REVIEW | Denied | - NEED WASTEWATER 3RD FLOOR REVIEW OF LOCATION/METHOD OF CONNECTION TO PUBLIC SEWER CHAD AMATEAU 740-6547 - NEED 1ST FLOOR MANHOLE CONSTRUCTION PERMIT APPROVAL - NEED DEQ REVIEW & APPROVAL TO CONSTRUCT ON SITE PRIVATE SEWER WITH MANHOLES DAVID AMASH 243-7400 33N STONE AV 7TH FLOOR BANK OF AMERICA BLDG - NEED COPY OF PRIVATE SEWER PLANS FOR BASE MAP UPDATE - NEED PCRWRD/3RD FLOOR CAPACITY REVIEW - KURT STEMM 740-6534 - NEED APPROVED WATER PLANS/WATER METER RECEIPT FROM TUCSON WATER |
08/16/2012 | TERRY STEVENS | ZONING | REVIEW | Approved |