Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T12CM00168
Parcel: 13409018E

Review Status: Completed

Review Details: REVISION - - 2ND

Permit Number - T12CM00168
Review Name: REVISION - - 2ND
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/04/2013 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
01/07/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied A 4" combination drain and vent pipe that is connected to a building drain can accommodate a maximum of 50 drainage fixture units. [Original comment: The combination drain and vent system located on the west side of the building is now receiving the discharge of the gravity grease interceptor and the sanitary drains from the bakery prep and the produce prep areas. Include the fixture units associated with this added load when sizing the combination drain and vent system pipes. Reference: Section 912.3, IPC 2006.]

Final Status

Task End Date Reviewer's Name Type of Review Description
02/06/2013 CPIERCE1 REJECT SHELF Completed