Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM00031
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/11/2012 | MARTIN BROWN | FIRE | REVIEW | Denied | Unable to locate response letter to 1st submittal denial. Same comments apply. (Note 12 on sheet S.1 indicates new kitchen hood. Please define if type 1 or type 2 and what kind of appliances will be installed in kitchen.) |
| 01/20/2012 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. PREVIOUS COMMENT 1. LETTERING HEIGHTS. 2. PREVIOUS COMMENT 2. THE SERVICE SINK WAS NOT LOCATED ON THE PLAN. VERIFY. 3. PREVIOUS COMMENT 3. WATER CLOSET CLEARANCE. 4. PREVIOUS COMMENT 4. WALL BRACING. 5. PREVIOUS COMMENT 5. LIST CODES USED. 6. PREVIOUS COMMENT 6. WRITTEN RESPONSES. 7. SHEET T-3; CODE STUDY: IN THE CODE STUDY, PROVIDE ON THE DRAWING THE REQUIRED PLUMBING FIXTURES PER THE IBC TABLE 2902.1. 8. SHEET A1.0; LAYOUT FLOOR PLAN: THE DRINKING FOUNTAIN INDICATED MUST BE A HIGH/LOW STYLE PER THE IBC SECTION 1109.5.1, OR A SINGLE POINT-OF-USE MODEL. REVISE THE ELEVATION 1/T1 ON SHEET T-4. 9. SHEET T-3; CODE STUDY: UNDER 'TYPES OF CONSTRUCTION', THE FIRE PROTECTION LISTED PER TABLE 601 IS INCORRECT. USE THE VB CONSTRUCTION TYPE FOR THE PROPER FIRE RESISTANCE RATINGS REQUIRED. 10. SHEET A1.0; LAYOUT FLOOR PLAN: PROVIDE A NORTH ARROW ON THE PLAN. 11. SHEET A1.0; LAYOUT FLOOR PLAN: THE RAMP IS PART OF THE MEANS OF EGRESS, AND SHALL MEET ALL THE REQUIREMENTS OF THE IBC SECTION 1010. INCLUDE SLOPE AND WIDTH INFORMATION FOR THE RAMP ON THE FLOOR PLAN. ARE HANDRAILS REQUIRED PER THE IBC SECTION 1010.8? CLARIFY. 12. SHEET A2.0; ELEVATIONS 1 AND 2: PROVIDE DIMENSIONS ON THE GRAB BARS PER THE ICC/ANSI A117.1-2003, FIGURE 604.5.1. REMOVE ALL REFERENCES TO ADAAG. |
| 01/24/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 01/31/2012 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 02/01/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. All plumbing fixtures and fittings shall be listed or labeled by a nationally-recognized, accredited conformity assessment company (e.g. UL, ETL, UPC, etc). Reference: Section 301.1.1, UPC 2006. 2. Clarify the description and the intended use of fixture P-8. It is scheduled as a 2-compartment prep sink but the architectural equipment list specifies a single-compartment sink. If it is to function as a prep sink, it will require an indirect waste connection per Section 801.2, UPC 2006. 3. Provide the listing and the installation information for the pedicure chairs (P-4). All foot spa units being connected to the building plumbing system shall be listed by a recognized testing and listing agency as complying with ASME/ANSI A112.19.7M, Whirlpool Bathtub Appliances. The units shall be directly connected to the waste system through a trap and vent per Sections 1001.1 and 1002.1, 2006 UPC. Each foot spa shall have separate backflow protection (both hot and cold water services require separate backflow protection). If water is supplied for spray attachments as well as tub filling, provide reduced pressure backflow protection assemblies. See http://cms3.tucsonaz.gov/files/dsd/FootSpa_Plumbing.pdf for further information regarding installation requirements. 4. Provide the listing and the installation information for the shampoo chairs (P-3). The units shall be directly connected to the waste system through a trap and vent per Sections 1001.1 and 1002.1, 2006 UPC. Reference: Sections 301.1.1 and 401.1, UPC 2006. 5. Clarify the specifications for the proposed water heater; it is shown as having an input of 75 MBH on sheet P-2 but it is specified as having an input of 65 MBH on sheet P-5. Reference: Section 103.2.3, UPC 2006. 6. Clarify keynote #3 on sheet P-1. Reference: Section 103.2.3, UPC 2006. |
| 02/01/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the background for detail 1/M-1 (called the "Mechanical Demo Floor Plan" but appears to be a roof plan) to coordinate with the rest of the drawings. Reference: Section 106.3.1, IMC 2006. 2. Clarify the equipment shown on detail 1/M-1 that is not specified or does not coordinate with the rest of the activity: e.g. EF-4 and EC-1. Reference: Section 106.3.1, IMC 2006. 3. Clarify the balancing requirements for the existing AC unit (shown as "XXX CFM" OSA and 150 CFM RA on sheet M-1). Reference: Section 106.3.1, IMC 2006. 4. Clarify the return air balancing requirements for AC-2 (shown as 150 CFM on sheet M-1 and scheduled for 1200 CFM on sheet M-2). Reference: Section 106.3.1, IMC 2006. 5. Provide zone supply air flow rate (Vpz, ASHRAE 62.1-2004) for each zone in the ventilation calculations. 6. Clarify the remarks used in the Packaged Rooftop Unit Schedule (e.g. missing remarks 9 through 14) and in the Exhaust Fan Schedule (e.g. note # 4?). Reference: Section 106.3.1, IMC 2006. 7. Clarify how the termination of the local exhaust drop for the pedicure units will be located 6" above the workspace. Reference: Section 106.3.1, IMC 2006. 8. Provide exhaust connections for the two clothes dryers. Reference: Section 504.1, IMC 2006. |