Permit Review Detail
Review Status: Completed
Review Details: LUCAPPS - OVERLAY ZONE REV
Permit Number - T11SA00046
Review Name: LUCAPPS - OVERLAY ZONE REV
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/04/2011 | JIM VOGELSBERG | ENGINEERING | REVIEW | Approved | |
| 03/08/2011 | JOE LINVILLE | LANDSCAPE | REVIEW | Denied | Clarify note 2 on sheet AO.0. regarding non-native plants. Submit an NPP plan or application for exception. The previous plans for the site show an existing tree or trees in the expansion area. DS 2-15.0 Locate the tree sculpture on the site plan and show any associated plantings. |
| 03/09/2011 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Teresa's Mosaic Cafe T11SA00046 Overlay Zone Application - Scenic Corridor Zone (SCZ). TRANSMITTAL DATE: March 9, 2011 COMMENTS: Please resubmit revised drawings along with a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1) It does not appear that a site plan has been submitted for this project. Prior to approval of the SCZ Overlay a site plan that meets the requirement of D.S. 2-02.0 must be submitted to PDSD. 2) Show the 400-foot SCZ corridor boundary for both Silverbell Road and Ironwood Hill Drive on the plan. 3) Please add the following notes to the site plan. i) No grading beyond that is necessary for siting of buildings, drives, private yards, and structural improvements. All viable vegetation with a caliper of 4 inches or greater and all saguaro cacti will be preserved or relocated on the site per the Native Plant and Preservation Ordinance. ii) Drainageways are to be maintained in their natural state. iii) All new utilities for development on private property or public right-of-way will be underground. Trenching is permitted for the placement of utilities lines, if area is revegetated in accordance with Land Use Code Sec. 3.7.5.2.D iv) Building or structure surfaces, which are visible from the Scenic Route, will have colors which are predominant within the surrounding landscape, such as desert and earth tones. v) Fencing and freestanding walls facing the Scenic Route will meet the material restrictions in Sec. 3.7.3, Screening Requirements. If you have any questions about this transmittal, please contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.com RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents |
| 03/23/2011 | PATRICIA GEHLEN | ZONING-DECISION LETTER | WRITE DECISION LETTER | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES March 23, 2011 Tom Kegan The Architecture Company 2625 N. Silverbell Road Tucson, Arizona 85745 Subject: T11SA00046 Scenic Corridor Overlay Zone for 2456 North Silver Mosaic Drive Dear Dan: Your submittal of February 11, 2011 for the above project has been reviewed by the Community Design Review Committee and Denied. Please resubmit three (3) sets of the documents per the on line comments. Zoning and Landscape have denied the plans. The public comment period will be opened within the next week. Should you have any questions, please call me at 837-4919. Sincerely, Patricia Y. Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: (520) 622-4506 |