Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - RESUBMITTAL
Plan Number - T11PI00014
Review Name: PIA - RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/23/2012 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approv-Cond | March 19, 2012 SUBJECT: Silverbell Road (Walgreens) I-2011-019 T11PI00014, 2st Rev. PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section Permits and Codes Section has reviewed the PIA plan set for the subject project and recommend conditional approval of the PIA Plan at this time. The following comments need to be addressed in the prior to submittal of the mylars. Please provide a written response to each comment and include red line drawings with re-submittal. 1. Sheet 3, Detail 4/3: Indicate the use of a tactile warning device from the TDOT approved supplier list (attached). 2. Sheet 3, Detail 3/3: Reference a PC/COT Std. Dtl. for the proposed bollards/post barricades on the multi-use path. 3. Sheet 3, Detail 3/3: Stop sign must be placed per PC/COT Signing Manual. Please refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |
| 03/23/2012 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
| 03/23/2012 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
| 03/23/2012 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
| 03/23/2012 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
| 03/23/2012 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
| 03/23/2012 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
| 03/23/2012 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
| 03/23/2012 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
| 03/23/2012 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
| 03/30/2012 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Approv-Cond | Minor comments so I will issue a conditional approval and we can exchange PDFs prior to a mylar submittal. It appears that we have the right of way needed to connect the multi-use path from the Walgreens development to the frontage road so we should separate the path from the sidewalk to place the 10' path behind the bus pad. Thanks, Jose |
| 04/03/2012 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
| 04/03/2012 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed |