Plan Number: T11PI00014
Parcel: Unknown

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T11PI00014
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/10/2012 GARY WITTWER DOT LANDSCAPE REVIEW Approved
02/07/2012 JOSE ORTIZ DOT TRAFFIC REVIEW Denied February 7, 2012
ACTIVITY NUMBER: T11PI00014
PROJECT NAME: Walgreens at Silverbell
PROJECT ADDRESS: 550 N Silverbell Road
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. Include a response letter with the next submittal that states how all comments have been addressed.

1. See redlines on the submitted drawings and address the redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes.

2. Place the PIA case number on the cover sheet.


If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov
02/10/2012 RLEIGH1 UTILITY CLEARANCES COT STREETS DIVISION Denied
02/10/2012 RICHARD LEIGH DOT ENGINEERING REVIEW Denied February 9, 2012


SUBJECT: Silverbell Road (Walgreens) I-2011-019 T11PI00014, 1st Rev.

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

Permits and Codes Section has reviewed the PIA plan set for the subject project and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal. Please provide a written response to each comment and include red line drawings with re-submittal.

1. Include the plan number "I-2011-019" in title block of each sheet.

2. Include Development Services Department PIA activity number "T11PI00014" on cover sheet.

3. Provide a cross section of the right turn lane.

4. Clearly indicate the limits of the sidewalk removal limits.

5. Place a note on drawing indicating that the owner of the property is responsible for the maintenance and blue staking of the onsite drainage facilities located in the public right-of-way.

6. Clearly indicate that the cross slope of the pedestrian crosswalk area in the driveway will not exceed 2%.

7. Clearly show how storm water flows will be routed through the proposed right turn lane.

8. Include in legend all line work used in drawing.

9. Sheet 3, Dtl. 1: Provide a detail or reference a Std. Dtl. For the pipe connection into the existing manhole.

10. Sheet 3, Del. 2: Provide a thickened edge for the proposed multiuse asphalt path and indicate that the minimum density for the subgrade will be 100% per SSPI 205.

11. Sheet 3, Dtl. 3: Curb access ramp should be based on Std. Dtl. 207 Sheet 4A of 5.

12. Sheet 3, Dtl. 4: Indicate the proposed lift thicknesses and mix # per SSPI 406.

13. Please submit copies of the PIA paving plans to the following utilities and provide this office with a Utility Plan Receipt from each of the utility companies:

City of Tucson Transportation Department, Streets Division
Tucson Water
Pima County, Wastewater Management
Qwest Communications
Tucson Electric Power
Cox Communications
Southwest Gas Corp.
El Paso Natural Gas*
Kinder Morgan Energy*
* When the above two utilities are not involved, a form filled out with the "RECEIVED BY:" line stating "not needed" may be submitted.

Please refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov
02/10/2012 RLEIGH1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied
02/10/2012 RLEIGH1 UTILITY CLEARANCES PC WASTEWATER MGMT Denied
02/10/2012 RLEIGH1 UTILITY CLEARANCES QUEST COMMUNICATION Denied
02/10/2012 RLEIGH1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied
02/10/2012 RLEIGH1 UTILITY CLEARANCES COX COMMUNICATION Denied
02/10/2012 RLEIGH1 UTILITY CLEARANCES SOUTHWEST GAS CORP Denied
02/10/2012 RLEIGH1 UTILITY CLEARANCES EL PASO NATURAL GAS Denied
02/10/2012 RLEIGH1 UTILITY CLEARANCES KINDER MORGAN ENERGY Denied
02/13/2012 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approv-Cond The notes on sheet 1 mention using asphalt mix number 1 and mix 2. The paving detail on sheet 3 does not specify other that 5 inches of asphalt. Please clarify the pavement section, showing both mixes and the fact that it will take two lifts to complete.
03/08/2012 RICHARD LEIGH PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
03/08/2012 RICHARD LEIGH PIA COORDINATOR OUT TO CUSTOMER Completed