Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: T11PI00013
Parcel: Unknown

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T11PI00013
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/20/2012 BLANCA ESPINO DOT ENGINEERING REVIEW Denied January 20, 2012


SUBJECT: CIRCLE K, SPEEDWAY BLVD AND CRAYCROFT RD OFFSITE IMPR I-2011-017 T11PI00013 1st Rev.

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

Permits and Codes Section has reviewed the PIA plan set for the subject project and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal. Please provide a written response to each comment and include red line drawings with re-submittal.

1. Include the plan number "I-2010-017" in title block of each sheet.

2. Include Development Services Department PIA activity number "T11PI0013" on cover sheet.

3. Provide cross section callouts in plan views for cross sections shown on sheet 3.

4. Clearly delineate and label the existing and future right-of-way limits.

5. If the future rights-of-way per the MS&R will not be dedicated with this development package, pedestrian access easements will be required for the sidewalk and access ramps which lie on the perimeter of the development.

6. Sheet 3: Show and label cross slopes and longitudinal slopes of the proposed bus bay.

7. Sheet 3: The existing grades shown along the north edge of the proposed concrete bus bay indicate that there are some dip sections and flat areas, which are potential areas for storm waters to pond. Provide additional construction details to ensure positive drainage along the bus bay. Additionally, the catch basin inlet may have to be modified to efficiently direct flows into the catch basin inlet opening.

8. Sheet 3, Pavement structural Detail: Clarify that the minimum dry density for the subgrade under the proposed PCCP is 100%.

9. Please submit copies of the PIA paving plans to the following utilities and provide this office with a Utility Plan Receipt from each of the utility companies:

City of Tucson Transportation Department, Streets Division
Tucson Water
Pima County, Wastewater Management
Qwest Communications
Tucson Electric Power
Cox Communications
Southwest Gas Corp.
El Paso Natural Gas*
Kinder Morgan Energy*
* When the above two utilities are not involved, a form filled out with the "RECEIVED BY:" line stating "not needed" may be submitted.

Refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov
01/23/2012 JOSE ORTIZ DOT TRAFFIC REVIEW Denied January 23, 2012
ACTIVITY NUMBER: T11PI00013
PROJECT NAME: Circle K
PROJECT ADDRESS: Speedway/Craycroft
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. Include a response letter with the next submittal that states how all comments have been addressed.

1. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes.

2. Add a note to the Signing Notes to have the contractor contact Tom Fisher or Bea Paulus to determine the location of the Suntran bus stop sign.

3. Place the PIA and CDRC Case number on the cover sheet.



If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov
01/25/2012 RICHARD LEIGH PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed Erin,

I'm waiting for Lance Peterson's comments. I sent him an email this morning and should be hearing back from him soon.
01/25/2012 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied
01/25/2012 RICHARD LEIGH PIA COORDINATOR OUT TO CUSTOMER Completed Erin,

I'm waiting for Lance Peterson's comments. I sent him an email this morning and should be hearing back from him soon.
12/16/2011 BESPINO1 UTILITY CLEARANCES COT STREETS DIVISION Denied
12/16/2011 BESPINO1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied
12/16/2011 BESPINO1 UTILITY CLEARANCES PC WASTEWATER MGMT Denied
12/16/2011 BESPINO1 UTILITY CLEARANCES QUEST COMMUNICATION Denied
12/16/2011 BESPINO1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied
12/16/2011 BESPINO1 UTILITY CLEARANCES COX COMMUNICATION Denied
12/16/2011 BESPINO1 UTILITY CLEARANCES SOUTHWEST GAS CORP Denied
12/16/2011 BESPINO1 UTILITY CLEARANCES EL PASO NATURAL GAS Denied
12/16/2011 BESPINO1 UTILITY CLEARANCES KINDER MORGAN ENERGY Denied
12/20/2011 GARY WITTWER DOT LANDSCAPE REVIEW Passed