Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/27/2012 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
01/27/2012 | BLANCA ESPINO | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
01/27/2012 | BLANCA ESPINO | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
12/06/2011 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | December 6, 2011 ACTIVITY NUMBER: T11PI00012 PROJECT NAME: The Retreat PROJECT ADDRESS: 1000 E 22nd Street PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer NOTE: THE COMMENTS BELOW APPLY IF TDOT DOES NOT INCLUDE THIS DESIGN INTO THE RTA 'KINO PARKWAY OVERPASS AT 22ND STREET' PROJECT. THE DEVELOPER WILL BE REQUIRED TO PAY IN-LIEU FEES TO TDOT IF THIS DESIGN IS INCORPORATED INTO THE NOTED RTA PROJECT. Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. Include a response letter with the next submittal that states how all comments have been addressed. 1. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes. 2. Along 22nd Street ensure that all existing signs that are effected by the off-site improvements and are applicable to the roadway remain in place or relocated to an appropriate location. If damaged or unsuitable for reuse then replace with new sign and/or post. 3. Place the PIA and CDRC Case number on the cover sheet. 4. Add the following Pavement Marking/Striping General Notes to the Plans: USE 2" SQUARE-TUBE POST AND SQUARE TUBE POST FOUNDATIONS FOR SIGNING. BARRICADE PLAN MUST BE SUBMITTED TO THE CITY OF TUCSON TRAFFIC ENGINEERING FOR APPROVAL 48 HOURS IN ADVANCE OF ANY WORK IN PUBLIC RIGHT OF WAY.' 'ALL NON-SIGNALIZED INTERSECTION STREET NAMES MUST HAVE E-W BLOCK NUMBER ADDRESSES FOR E-W ROADWAYS AND N-S BLOCK NUMBER ADDRESSES FOR N-S ROADWAYS.' If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov |
12/08/2011 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
12/08/2011 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
12/08/2011 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
12/08/2011 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
12/08/2011 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
12/08/2011 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
12/08/2011 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
12/08/2011 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
12/08/2011 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
12/12/2011 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | I do not have any problem with the planting. You will need to add TDOT standard notes to the plans. (call or e-mail me if you don't already have them) We do have existing irrigation along the east side of Park Ave at this location. Pipes will need to be sleeved in 4" PVC sch 40. Please have this info on the Civil Drawing as well. |
12/20/2011 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approv-Cond | Please see the redlined plan set for comments. |