Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T11PI00010
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/25/2012 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
01/25/2012 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
09/28/2011 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
10/13/2011 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | October 13, 2011 ACTIVITY NUMBER: T11PI00010 PROJECT NAME: Grant Rd Right Lane (TMC) PROJECT ADDRESS: 5301 E Grant Rd PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. Include a response letter with the next submittal that states how all comments have been addressed. 1. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes. 2. An existing light pole is impacted with the installation of the proposed right turn lane. Confirm with Ernie Encinas that the new location is acceptable to the city. 3. Place the PIA and CDRC Case number on the cover sheet. If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov |
10/19/2011 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
10/19/2011 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | October 18, 2011 SUBJECT: GRANT ROAD RIGHT TURN LANE IMPROVEMENTS (TMC) I-2011-12 T11PI00010, 1st Rev. PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal. 1. Include the plan number "I-2010-012" in title block of each sheet. 2. Include Development Services Department PIA activity number "T11PI0010" on cover sheet. 3. Show all symbols and lines used in drawing in the legend 4. Remove all notes pertaining to the "PROMPT PAYMENT STATUE" This verbiage does not apply to City Plans. 5. Sheet C-2: "Modified Valley Gutter Detail" should show proposed all applicable dimensions. 6. Sheet C-2: "Modified Valley Gutter Detail" should depict proposed slotted drain. 7. Sheet C-2: "Modified Valley Gutter Detail", Section A-A: Will a load transfer joint be used to join the proposed perimeter concrete ribbon directing flow into the catch basin and the catch basin structure. 8. Sheet C-5: Clearly indicate existing and new right-of-way in plan view and provide recordation information. 9. Sheet C-5: Indicate Paving Limits in plan view. 10. Sheet C-5: Indicate how the proposed 2% cross slope will be warped into existing pavement slope at intersection around the proposed catch basin.. 11. Sheet C-5: Provide Pedestrian access easement for those portions of the proposed sidewalk encroaching onto private property. 12. Sheet C-5: For both access ramps provide a 6-foot wide ramps and 6 foot wide landings to match proposed wide sidewalks. 13. Please submit copies of the PIA paving plans to the following utilities and provide this office with a Utility Plan Receipts from the companies to the City: City of Tucson Transportation Department, Streets Division Tucson Water Pima County, Wastewater Management Qwest Communications Tucson Electric Power Cox Communications Southwest Gas Corp. El Paso Natural Gas* Kinder Morgan Energy* * When the above two utilities are not involved, a form filled out with the "RECEIVED BY:" line stating "not needed" may be submitted. Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |
10/19/2011 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
10/19/2011 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
10/19/2011 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
10/19/2011 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
10/19/2011 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
10/19/2011 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
10/19/2011 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
10/19/2011 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
11/17/2011 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved |