Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/01/2011 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | July 1, 2011 ACTIVITY NUMBER: T11PI00004 PROJECT NAME: The District PROJECT ADDRESS: 550 N 5th Ave PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. 1) The following items must be revised or added to the plan. See redlines on the submitted drawings and address the redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes. 2) A bus stop currently exists along 6th Street and SunTran has expressed an interest in maintaining that stop. The desired location of the stop is 50' west of Herbert Avenue as noted in the redlines. A detail is attached with the redlines as a reference for the design criteria of the bus pad location. 3) The Herbert Avenue alley striping needs revisions as illustrated in the redlines. 4) Verify compliance with Park Wise regarding the parking along 5th Street. If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov |
07/01/2011 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
07/01/2011 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | June 30, 2011 SUBJECT: THE DISTRICT I-2011-005, T11PI00004, 2nd Rev. PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal. 1. Submit approved development plan with next submittal. Based on approved development plan additional comments may be generated. 2 Show all symbols and lines used in plan set in the legend. Line and symbols should be per PC/COT S.D. 100 and abbreviations should be per PC/COT S.D. 101. 3. Clearly label all proposed and existing structures within the public rights-of way. 4. Provide complete details for any proposed hardscape and landscaping within the public rights-of-way in this plan set. 5. A 6' wide unobstructed pedestrian path will have to be provided along 5th Street and 6th Street. 6. Provide complete construction details for the proposed sidewalk scupper at Sta. 12+53.57 (5th Street). 7. Have easements been obtained for the proposed steps and ramps along 6th Street? Please contact Jim Rossi with COT Real Estate, 791-4371. 8. Provide details on how onsite storm drains will connect to proposed scuppers on 6th Street. Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |
07/01/2011 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
07/01/2011 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
07/01/2011 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
07/01/2011 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
07/01/2011 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
07/01/2011 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
07/01/2011 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
07/01/2011 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
07/05/2011 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
07/07/2011 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approv-Cond | 1. Please contact me at 520-837-6618. I need to send you TDOT standard notes for planting in ROW. 2. Please relocate the backflow, conroller, valves and mainline out of the ROW. 3. Resubmit front page with TDOT Standard Notes and Irrigation sheet with new locations of equipment out of ROW |
08/24/2011 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
08/24/2011 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed |