Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T11PI00003
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/08/2011 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | No objection pertaining to Street Maitenance. |
03/10/2011 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | March 10, 2011 ACTIVITY NUMBER: T11PI00003 PROJECT NAME: NWC Harrison/O S T PROJECT ADDRESS: 1010 S Harrison Rd PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. Include a response letter with the next submittal that states how all comments have been addressed. 1. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes. 2. Along Old Spanish Trail ensure that all existing signs that are effected by the off-site improvements and are applicable to the roadway remain in place or relocated to an appropriate location. If damaged or unsuitable for reuse then replace with new sign and/or post. 3. If existing striping widths permit restripe Old Spanish Trail from Speckle Stone Way to Harrison with a 3-lane cross section plus 2 bike lanes. The 3-lane cross section shall consist of one eastbound through lane, one westbound through lane and a continuous two-way left turn lane. 4. Place the PIA and CDRC Case number on the cover sheet. If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov |
03/14/2011 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
03/21/2011 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
03/21/2011 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | March 17, 2011 SUBJECT: NWC HARRISON AND OLD SPANISH TRAIL, I-2011-004, T11PI00003, 1st Rev. PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal. 1. Include the plan number "I-2010-004" in title block of each sheet. 2. Include Development Services Department PIA activity number "T11PI0003" on cover sheet. 3. Submit approved development plan with next submittal. 4. Submit approved drainage report with next submittal. Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |
03/21/2011 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | Plase submit Utility Receipts from the following utility companies: City of Tucson Transportation Department, Streets Division Tucson Water: Pima County Wastewater Management Qwest Communications Tucson Electric Power Cox Communications Southwest Gas Corp. El Paso Natural Gas* Kinder Morgan Energy* |
03/21/2011 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
03/21/2011 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | Plase submit Utility Receipts from the following utility companies: City of Tucson Transportation Department, Streets Division Tucson Water: Pima County Wastewater Management Qwest Communications Tucson Electric Power Cox Communications Southwest Gas Corp. El Paso Natural Gas* Kinder Morgan Energy* |
03/21/2011 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
03/21/2011 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
03/21/2011 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
03/21/2011 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
03/21/2011 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
03/21/2011 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
03/21/2011 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied |