Permit Review Detail
Review Status: Completed
Review Details: FLOODPLAIN
Permit Number - T11OT00816
Review Name: FLOODPLAIN
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/17/2011 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | Laith Alshami, Engineering and Floodplain Review, 05/19/2011 The project shall be approved once the following comments have been satisfied: 1. Provide the name and address of the property owner. 2. Provide the following: a. A cost estimate for the proposed improvements, including mobilization and contingency costs. b. A recent assessment or appraisal of the present value of the structure being remodeled. Since the subject structure is impacted by the regulatory floodplain, the requested information will be evaluated to determine if the structure is proposed to be substantially improved as defined by the Floodplain Ordinance (i.e. Substantial improvement means any reconstruction, repair, rehabilitation, addition or other improvement of a structure, the cost of which equals or exceeds fifty (50) percent of the market value of the structure before the "start of construction" of the improvement.). If the structure is determined to be substantially improved, it shall conform to the Floodplain Ordinance regulations. At the time of improving or reconstructing the structure or development, floodproofing (nonresidential structures only) may be considered as one of the means of bringing it in compliance with the Floodplain Ordinance. If the structure is determine not to be substantially improved, conformance to the Floodplain Ordinance is not required, but recommended. If additional improvements are proposed in the future, the cost will be added to the cost of the presently proposed improvements until the total improvements costs equal or exceed the 50% market value of the structure at that time. Full Compliance will be required then. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 06/13/2011 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 06/13/2011 | SUE REEVES | REJECT SHELF | Completed |