Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T11CM03933
Parcel: 130144360

Review Status: Completed

Review Details: REVISION - - 1ST

Permit Number - T11CM03933
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/02/2012 GERRY KOZIOL WWM REVIEW Approved
03/08/2012 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. LETTER OF REVISIONS; STRUCTURAL ENGINEERING REVISION 1: PROVIDE A CALCULATION FOR THE NEW FOOTING ALONG GRID 2 BETWEEN GRIDS E AND F. IT APPEARS A NEW COLUMN HAS ALSO BEEN ADDED ON GRID 2.
2. LETTER OF REVISIONS; STRUCTURAL ENGINEERING REVISION 2: PROVIDE CALCULATIONS FOR THE NEW FOOTINGS NEAR GRIDS 5.3 AND B AND GRIDS 5.4 AND A.
3. LETTER OF REVISIONS; STRUCTURAL ENGINEERING REVISION 3: PROVIDE CALCULATIONS FOR THE NEW DECORATIVE COLUMN FOOTINGS NEAR GRIDS 5.4 AND E AND GRIDS 5.6 AND E.
4. SHEETS S1.0, S1.1, AND S1.2: DELTA 3 IS NOTED IN THE REVISIONS, BUT NOTHING IS CLOUDED. CLARIFY.
5. SHEET S1.4: INDICATE DELTA 3 IN THE REVISIONS. THE FOOTING SCHEDULE MARK F4 SHOULD BE CLOUDED.
6. SHEETS S2.0 AND S2.1: DELTA 3 INDICATES THE ENTIRE SHEET HAS BEEN REVISED. SPECIFICALLY CLOUD THE CHANGED ITEMS.
7. SHEET S4.1; DETAIL 121: DETAIL 121 COULD NOT BE LOCATED ON THE PLANS. SHOULD THIS DETAIL BE REFERENCED IN THE LINTEL SCHEDULE? CLARIFY.
8. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
03/14/2012 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
03/14/2012 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
03/21/2012 CINDY AGUILAR APPROVAL SHELF Completed
03/21/2012 CINDY AGUILAR OUT TO CUSTOMER Completed