01/05/2012 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET S2.0 (FOUNDATION PLAN); STRUCTURAL CALCULATIONS (PAGE 44): THE FOOTING LOCATED AT GRIDS A AND 5 IS CALLED OUT AS A 10'-0"X10'-0"X1'-0" WITH 7-#7 EACH WAY BOTTOM IN THE CALCULATIONS, WHILE THE FOOTNG SCHEDULE ON S1.4 INDICATES AN F3 IS 10'-0"X10'-0"X1'-0" WITH 7-#6 EACH WAY BOTTOM. CLARIFY.
2. SHEET S2.0; FOUNDATION PLAN: THERE ARE SEVERAL COLUMNS ALONG GRIDS B, E, AND 5.2 THAT HAVE NO DESIGNATION. PROVIDE REFERENCE FOR THESE COLUMNS.
3. SHEET S2.1; FOUNDATION PLAN: THERE ARE SEVERAL COLUMNS ALONG GRID 8 THAT HAVE NO DESIGNATION. PROVIDE REFERENCE FOR THESE COLUMNS.
4. SHEET S3.0; DETAIL 102: THE DETAIL INDICATES THE BOTTOM OF FOOTING TO BE 1'-0" MINIMUM BELOW THE TOP OF THE SLAB, WHILE THE GEOTECHNICAL REPORT REQUIRES A MINIMUM OF 18" BELOW FINISH GRADE. REVISE DETAIL.
5. STRUCTURAL CALCULATIONS; PAGE 45: THERE ARE SEVERAL COLUMNS LOCATED BY DIMENSIONAL COORDINATES. SINCE ALL COLUMNS ON THE PLANS FALL ON GRID LINES, REPLACE THE DIMENSIONAL COORDINATES WITH THE GRID LINES FOR CHECKING PURPOSES.
6. STRUCTURAL CALCULATIONS: DESIGN FOR THE WALL W1 (GRIDS 5.2 TO 5.8 AND GRIDS A TO C) FOOTING WAS NOT LOCATED IN THE CALCULATIONS. VERIFY.
7. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
01/05/2012 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Approved
01/05/2012 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed
01/05/2012 ROBERT SHERRY WATER REVIEW Passed
01/06/2012 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Approved
01/11/2012 GERRY KOZIOL WWM REVIEW Denied 1. WESTERN INSTITUTE FOR LEADERSHIP DEVELOPMENT - CHARTER HIGH SCHOOL

2. NEED TO SHOW LOCATION/METHOD OF CONNECTION TO PUBLIC SEWER - NEED PCRWRD-1ST FLOOR CHAD AMATEAU REVIEW 740-6547

3. NEED PCRWRD 3RD FLOOR CAPACITY REVIEW KURT STEMM 740-6607

4. NEED WASTEWATER/IWC/TOM TOMCHAK REVIEW OF NEUTRALIZATION TANK FOR SCIENCE SINKS - 724-6200 3035 W EL CAMINO DEL CERRO
12/28/2011 DAVE MANN FIRE REVIEW Approved
12/29/2011 ELIZABETH LEIBOLD ENGINEERING REVIEW Denied Once grading plan, FPUP, and plat are approved, Engineering can stamp the bldg plan set. Call 837-4934 to set up meeting for expedited review of resubmittal documents and stamping.

Final Status

Task End Date Reviewer's Name Type of Review Description
01/25/2012 CPIERCE1 OUT TO CUSTOMER Completed