Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T11CM03933
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/05/2012 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET S2.0 (FOUNDATION PLAN); STRUCTURAL CALCULATIONS (PAGE 44): THE FOOTING LOCATED AT GRIDS A AND 5 IS CALLED OUT AS A 10'-0"X10'-0"X1'-0" WITH 7-#7 EACH WAY BOTTOM IN THE CALCULATIONS, WHILE THE FOOTNG SCHEDULE ON S1.4 INDICATES AN F3 IS 10'-0"X10'-0"X1'-0" WITH 7-#6 EACH WAY BOTTOM. CLARIFY. 2. SHEET S2.0; FOUNDATION PLAN: THERE ARE SEVERAL COLUMNS ALONG GRIDS B, E, AND 5.2 THAT HAVE NO DESIGNATION. PROVIDE REFERENCE FOR THESE COLUMNS. 3. SHEET S2.1; FOUNDATION PLAN: THERE ARE SEVERAL COLUMNS ALONG GRID 8 THAT HAVE NO DESIGNATION. PROVIDE REFERENCE FOR THESE COLUMNS. 4. SHEET S3.0; DETAIL 102: THE DETAIL INDICATES THE BOTTOM OF FOOTING TO BE 1'-0" MINIMUM BELOW THE TOP OF THE SLAB, WHILE THE GEOTECHNICAL REPORT REQUIRES A MINIMUM OF 18" BELOW FINISH GRADE. REVISE DETAIL. 5. STRUCTURAL CALCULATIONS; PAGE 45: THERE ARE SEVERAL COLUMNS LOCATED BY DIMENSIONAL COORDINATES. SINCE ALL COLUMNS ON THE PLANS FALL ON GRID LINES, REPLACE THE DIMENSIONAL COORDINATES WITH THE GRID LINES FOR CHECKING PURPOSES. 6. STRUCTURAL CALCULATIONS: DESIGN FOR THE WALL W1 (GRIDS 5.2 TO 5.8 AND GRIDS A TO C) FOOTING WAS NOT LOCATED IN THE CALCULATIONS. VERIFY. 7. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
01/05/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
01/05/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
01/05/2012 | ROBERT SHERRY | WATER | REVIEW | Passed | |
01/06/2012 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
01/11/2012 | GERRY KOZIOL | WWM | REVIEW | Denied | 1. WESTERN INSTITUTE FOR LEADERSHIP DEVELOPMENT - CHARTER HIGH SCHOOL 2. NEED TO SHOW LOCATION/METHOD OF CONNECTION TO PUBLIC SEWER - NEED PCRWRD-1ST FLOOR CHAD AMATEAU REVIEW 740-6547 3. NEED PCRWRD 3RD FLOOR CAPACITY REVIEW KURT STEMM 740-6607 4. NEED WASTEWATER/IWC/TOM TOMCHAK REVIEW OF NEUTRALIZATION TANK FOR SCIENCE SINKS - 724-6200 3035 W EL CAMINO DEL CERRO |
12/28/2011 | DAVE MANN | FIRE | REVIEW | Approved | |
12/29/2011 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Denied | Once grading plan, FPUP, and plat are approved, Engineering can stamp the bldg plan set. Call 837-4934 to set up meeting for expedited review of resubmittal documents and stamping. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/25/2012 | CPIERCE1 | OUT TO CUSTOMER | Completed |