Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM03914
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/13/2012 | GERRY KOZIOL | WWM | REVIEW | Approved | |
01/13/2012 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
12/23/2011 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
12/23/2011 | RICK MYERS | PLUMBING-COMMERCIAL | REVIEW | Denied | 1.reference 413.1 2006 UPC: water heater may not be sole source of heat control for public use lavatory. 2. four inch branch from main will require a full size upper terminal cleanout. |
12/23/2011 | MARTIN BROWN | FIRE | REVIEW | Approved | |
12/29/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Clarify the discrepancy between the mechanical plan and detail 1/M.2 with regard to the location of the unit and the structural requirements for the walls and ceiling. |
12/29/2011 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1) PROVIDE AVAILABLE GROUND FAULT CALCULATIONS AND RATING OF EQUIPMENT 2) PROVIDE IECC LIGHTING COMPLIANCE CERTIFICATE |
12/29/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
12/29/2011 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A2; CEILING PLAN NOTES: NOTE 7 INDICATES TO COORDINATE STRUCTURAL FRAMING HANGERS, ETC., WITH THE STRUCTURAL ENGINEER. NO STRUCTURAL ENGINEER HAS BEEN INCLUDED IN THIS PROJECT. PROVIDE STRUCTURAL CALCULATIONS AND DETAILS (ON THE PLANS) FOR SUPPORT OF THE NEW FANS, AIR HANDLING UNITS, ETC. 2. SHEETS A4 AND A4A; STOREFRONT NOTES: NOTE 6 INDICATES DETAILS TO BE PROVIDED FOR EQUIPMENT SUPPORT BY STRUCTURAL. PROVIDE CALCULATIONS AND DETAILS. |
12/29/2011 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
12/29/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |