Permit Number - T11CM03894
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/03/2012 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Approved | reviewed by Dan Santa Cruz |
| 01/06/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 01/09/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 01/09/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference: Section 503.2.7, IECC 2006, as amended by the City of Tucson. 2. Condensate drains may not terminate over a roof drain or downspout unless the roof drain or downspout terminates at or above grade in an area capable of absorbing the condensate flow without surface drainage. Reference: Section 307.2.1, IMC 2006, as amended by the City of Tucson. 3. Provide calculations demonstrating adequate ventilation. Reference: Section 403.3, IMC 2006, as amended by the City of Tucson. 4. Note that materials exposed in plenums shall conform to Section 602.2.1, IMC 2006. |
| 01/09/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Clarify the plumbing code to be used for this activity. This review has been made using the 2006 UPC with City of Tucson amendments. 2. Correct the size of the 2 psig gas piping upstream of RTU-14; 780 CFH at 450 feet requires a 1-1/4" pipe. Reference: Table 402.4(3), IFGC 2006. 3. Provide the sizing data (e.g. vent material, total vent height, and offsets) for the flue for the gas-fired unit heater. Reference: Section 511.0, UPC 2006. |
| 01/10/2012 | GERRY KOZIOL | WWM | REVIEW | Denied | 1. TENANT "B" WEST SUITE ONLY - FUTURE HOBBY LOBBY - FORMERLY PORTION OF MERVYN'S 2. NEED TO CLARIFY WASTEWATER PLUMBING FIXTURES TO REMAIN WITH ATTENTION TO RESTROOM DRAINS FOR CREDIT EVALUATION 3. WILL NEED 5TH FLOOR WASTEWATER CREDIT EVALUATION FOR EXISTING PLUMBING FIXTURES TO REMAIN AFTER DRAWING CLARIFICATION AND FOR REMOVAL OF 1 - TOILET, 1-LAV & 1-LOUNGE SINK PER DEMO DRAWINGS D1 DATED 12/16/11 4. NEED TO SHOW LOCATION/METHOD OF CONNECTION TO PUBLIC SEWER |
| 12/23/2011 | MARTIN BROWN | FIRE | REVIEW | Denied | Fire alarm system required. Refer to 2006 IFC, section 907.2.7 |
| 12/23/2011 | JASON GREEN | ENGINEERING | REVIEW | Denied | DATE: December 23, 2011 REVIEWER: Jason Green, CFM ACTIVITY: T11CM03894 (Building Plan) SUMMARY: Engineering Division of Planning & Development Services Department has received the building plan (T11CM03892). Engineering Division does not recommend approval of the building plan applications at this time. The following items need to be addressed: BUILDING PLAN COMMENTS: 1) Engineering could not verify that the building plan was in compliance with a stamped approved Development Plan Package for the proposed expansion. Please submit a copy of the stamped approved Development Plan, landscape, and NPPO plans with the next building plan submittal. 2) Engineering will re-review the building plan on the next submittal to insure compliance with the approved and stamped Development Plan. Additional comments may be forthcoming. GENERAL COMMENTS: Please provide the building plan with a copy of the last approved Development Plan. Further comments may be generated upon resubmittal of the building plan review. For questions or to schedule an appointment I can be reached at 837-4929. Jason Green, CFM Senior Engineer Associate Engineering Division Planning & Development Services |
| 12/28/2011 | TERRY STEVENS | ZONING | REVIEW | Approved |