Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM03682
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/01/2011 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
12/01/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted (i.e. exhausted even when the lights are off). Reference: Section 403.2.1 (4), IMC 2006. 2. Provide energy code compliance calculations for the building envelope and the mechanical systems. Use the climate zone for Pima County < 4,000 feet. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. |
12/01/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Electrical comments: 1.The 1/0 cu feeders only carry 150 amps, the overcurrent device shows 200 amps ? Provide the fault current at the service and let through to panel A. 3. Provide a 2006 IECC Lighting Budget Calculation, ComCheck ok, required per Commercial Submittals. Ray T Majuta Elect Pln Ck 12/1/11 |
12/01/2011 | ROBERT SHERRY | WATER | REVIEW | Denied | Provide a letter from Tucson Water confirming that the use of a 1-1/2" water meter will be allowed for this project (150 fixture units equates to a demand of 54 GPM) |
12/01/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Please provide structural details and explanation of how all interior partitions that are not attached or braced to the framing structure above complies with the 2006 IBC, Section 1607.13. |
12/01/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide information to show how the outlet temperature of the hot water is to be limited to 110 degrees at the lavatories. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006. 2. No more than one trap shall be installed on a trap arm. Reference: Section 1001.1, UPC 2006. 3. The trap and trap arm for a lavatory may not be increased more than one size larger than the minimum trap size shown in Table 7-3. Reference: Section 1003.3, UPC 2006. |
12/01/2011 | DAVE MANN | FIRE | REVIEW | Approved | |
12/01/2011 | RONALD BROWN | ADA | REVIEW | Passed | |
12/01/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
12/06/2011 | CPIERCE1 | WWM | REVIEW | Needs Review | |
12/06/2011 | CPIERCE1 | ENGINEERING | REVIEW | Needs Review |