Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM03680
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/05/2012 | FRODRIG2 | ZONING | REVIEW | Needs Review | |
| 01/05/2012 | FRODRIG2 | WWM | REVIEW | Needs Review | |
| 01/05/2012 | FRODRIG2 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
| 12/01/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 12/01/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | SHEET T1 1. Accessible parking space non compliant. a. Aisle must be full length of parking space, Section 502.3 b. Must be "Van Accessible, section 1106.5 c. Ramps need handrails d. Please provide a large scale detail showing all accessible requiremsnts: i.e. dimensions, slopes, ramps, aisles, signage and access to accessible route. SHEET A1 2. Provide handrails for both sides of stairs 3. Toilet is non compliant with ANSI Section 6. Please redesign to make toilet accessible including width of doors, clearance to be 2'-10" minimum. 4. Interior ramp needs to be 1:12 maximum slope or 6' long. 5. Show water heater suspension mounting detail. 6. Provide accessible drinking fountain. 7. Provide mop sink. END OF REVIEW |
| 12/01/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 12/01/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the plans to show how the plumbing will actually be done. 2. Provide a point of use water dispenser or a drinking fountain. 3. Provide a vacuum relief, drain pan, and an expansion tank for the water heater. 4. Provide heat traps and insulation for the first 8 feet of piping at the water heater. 5. Show how the water temperature at the lavatory will be luimited to 110 degrees Fahrenheit. |
| 12/01/2011 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 12/01/2011 | DAVE MANN | FIRE | REVIEW | Approved | |
| 12/01/2011 | RONALD BROWN | ADA | REVIEW | Passed | |
| 12/01/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |