Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T11CM03646
Parcel: 11205030B

Review Status: Active

Review Details: COMMERCIAL - NEW

Permit Number - T11CM03646
Review Name: COMMERCIAL - NEW
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
11/30/2011 ANY BUILDING-COMMERCIAL REVIEW Active
11/30/2011 ANY ZONING REVIEW Active
11/30/2011 ANY ELECTRICAL-COMMERCIAL REVIEW Active
11/30/2011 ANY WWM REVIEW Active
12/01/2011 MARTIN BROWN FIRE REVIEW Denied This comments apply to the job as a whole and will be repeated for all activity numbers.
1) Fire Department approved lock boxes will be required at
sliding gates.
2) Fire sprinklers will need to be installed in building A. Reference 2006 IFC, section 903.2.7.
3) An alarm system will be required in all residential buildings
except those containing fire sprinklers. Reference 2006
IFC, section 907.3.6.
4) Please provide clarification regarding separation between
Building A and Leasing building. Are they connected by
a roof structure? Do they require fire wall separation?
12/05/2011 ROBERT SHERRY WATER REVIEW Passed
12/05/2011 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide energy code compliance calculations for the additions to the building envelope; use the climate zone for Pima County < 4,000 feet. Provide sufficient detail on the drawings to evaluate the energy compliance of the additions to the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections 101.4, 101.4.3, and 104.2, International Energy Conservation Code 2006.
2. Specify the minimum resistance (R-value) of the insulation to be used the ducts for fan coil FC-5. Reference: Section 503.2.7, IECC 2006, as amended by the City of Tucson.
3. Show how fan coil FC-5 is being connected to the building structure and provide calculations to show that the building structure is not being adversely affected. Reference: Section 302.1, IMC 2006.
4. Provide calculations demonstrating adequate ventilation. Reference: Section 403.3, IMC 2006, as amended by the City of Tucson.
12/06/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Passed