Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T11CM03644
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/01/2011 | MARTIN BROWN | FIRE | REVIEW | Denied | This comments apply to the job as a whole and will be repeated for all activity numbers. 1) Fire Department approved lock boxes will be required at sliding gates. 2) Fire sprinklers will need to be installed in building A. Reference 2006 IFC, section 903.2.7. 3) An alarm system will be required in all residential buildings except those containing fire sprinklers. Reference 2006 IFC, section 907.3.6. 4) Please provide clarification regarding separation between Building A and Leasing building. Are they connected by a roof structure? Do they require fire wall separation? |
| 12/05/2011 | ROBERT SHERRY | WATER | REVIEW | Passed | |
| 12/05/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide energy code compliance calculations for the revised building envelope; use the climate zone for Pima County < 4,000 feet. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. 2. Provide calculations demonstrating adequate ventilation. Reference: Section 403.3, IMC 2006, as amended by the City of Tucson. |
| 12/06/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Clarify the plumbing code to be used for this activity. The plumbing General Notes on sheet P3.1 refer to the 2006 UPC but the Code analysis on sheet T1.1 refers to the 2006 IPC. This review has been made using the 2006 UPC. 2. Provide a waste and vent isometric diagram, indicating which portions of the work are new. Reference: Section 103.2.3, UPC 2006. 3. Indicate the materials to be used in the proposed plumbing systems for this activity. Reference: Sections 103.2.3, 301.1, 604.0, 701.0, 903.0, 1102.0, and 1209.5, UPC 2006. 4. Provide water pressure and water pipe sizing calculations. Reference: Section 610.1, UPC 2006. 5. The site plan shows an existing natural gas meter located on the south side of this building and calls for a 6" concrete slab to be poured over the high pressure gas line serving the meter. Verify if this is being done and if so, show how the gas line is to be protected from damage and be maintainable. Reference: Section 1211.1, UPC 2006. |
| 12/15/2011 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 12/16/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Sheet T1.1: Rework the square footage analysis and eliminate the covered walkway. Provide TI figures for the existing utility building converted into a fitness room and remodel of the existing patio cover. Include the existing storage as a separate TI square footage figure. Provide s.f. for the overall new office construction and its patio cover as separate entries. This includes buildings J, K and L. 2. Sheet A3.9: Show the patio cover of Building "L" attached to Building "A". Provide an hour separation. 3. Sheet A3.9: Fix the titles to include Building "L". 4. Detail 4/D1.1: Finish and make legible the Utility Building Demolition Plan. 5. Detail 3/A1.2: Provide large scale toilet plans and elevations showing all required accessibility code requirements including dimensions, clearances, slopes, accessories, fixtures and sanitary wall finishes as per Section 1210.2. 6. Details 4/D1.1, 3/A1.2 and Foundation Plan/S1.0 are Fitness Room and Office addition floor plans that do not match each other. Please rework all plans so that they relate to each other. 7. Sheet S1.0: At the Building "L" roof extension, show connection to Building "A" , reference and add all required details and provide a 1 hour separation. 8. Sheets S1.1, S1.0 and S2.0: Show Building "L" roof extension and connection to building "A". Detail 2c/S2.0 9. Sheet S3.0: finish sizing beams and provide details at the south side of Building "L" roof extension. Do we need columns here? Calculations also do not show this beam and connection details and calculations. 10. Sheet A1.2: Align the two floor plans as they are positioned on the site plan and show extended roof connection to building "A". END OF REVIEW |
| 12/23/2011 | TERRY STEVENS | ZONING | REVIEW | Denied | 12/23/2011 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site plan. Additional comments may be forthcoming. |
| 12/28/2011 | KEN VAN KARSEN | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/09/2012 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |