Permit Number: T11CM03642
Parcel: 11205030B

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T11CM03642
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/26/2012 MARTIN BROWN FIRE REVIEW Approved
01/31/2012 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied GENERAL
1. Several sheets through out this submittal have lettering smaller than the COT standard for all document submittals of 3/32" minimum for all lower and upper case. Please revise all sheets that are non-compliant and resubmit.
RESUBMITTAL REVIEW COMMENTS:
Please reference S1.0 through S3.1 for non-compliance.

2. The line weight of existing building elements to remain is too light. Please make the lines darker and resubmit.
RESUBMITTAL REVIEW COMMENTS:
Please reference D1.1 and A2.1. Some wall lines are missing.

3. OK
4. OK

5. On sheet SP-1, the legend and site plan indicate that all apartment buildings except buildings "A' and "C" are getting new access balconies.
a. Why not buildings "A" and "C" also?
b. Please provide a poche' symbol for these two building access balconies in the Legend and a definition of what is to be done here.
RESUBMITTAL REVIEW COMMENTS:
I'm still confused. As per the legend and the use of the legend symbols, it appears now that all the buildings are to have new flatwork installed in front again except for Buildings "A" and "C". Please coordinate your legend with your floor plan detailing.

6. OK
7. OK
8. OK
9. OK
10. OK

11. Sheet 3.2: Show connection of new shed roof from the new office building addition to the side of building "A".
a. Provide a 1 hour separation at this roof connection.
RESUBMITTAL REVIEW COMMENTS:
Please show connection on the East elevation and indicate the extent of the 1 hour wall.
Please show the one hour rating on all floor plans.
Please provide a ¾" wall section through this area showing 1 hour rating and the structural connection and how the two relate.
Please reference any and all rated partition details to this wall in plan, elevation and wall section.

12. Provide a 1 hour separation between the existing building "A" and the new 2C apartment addition or provide sprinkler system for the whole building as per Fire comments.
a. You are indicating that there exists an 8" RCMU wall separating the new construction. This could be very easily be maintained as a 1 hour partition.
RESUBMITTAL REVIEW COMMENTS:
Please show the one hour rating on all floor plans.
Please indicate a 1 hour rated partition extension to the bottom of the roof deck from the existing 8" RCMU partition of the single story apartment.
Please provide a ¾" wall section through this area showing 1 hour rating and the new addition structural connection and how the two relate.
Please reference any and all rated partition details to this wall in plan, elevation and wall section.

13. Provide construction details and large scale elevations for new and modified balcony railings. Show compliance with the 2006 IBC, Sections 1013 and 1606.7.1.
RESUBMITTAL REVIEW COMMENTS:
Please reference this detail on all floor plans where both these balcony railing occur. Please be specific.
Please provide a structural detail showing how the railing is attached and structural calculations.

14. OK

15. At detail 1/SP1.1, 1/A1.1 and 1/A1.2, the most western unit of the existing building is poche'd as if it is to be new construction when it is in fact existing. Please reconcile.
RESUBMITTAL REVIEW COMMENTS:
At detail 1/SP1.1 please indicate that the existing end apartment on building "A" is a single story unit and that a new second story is to be added to the existing first level. Please indicate this addition as you did for the new 2 story addition attached to it.

ADDITIONALLY
At detail 5/D1.1 Also please indicate that the existing end apartment on building "A" is a single story unit and that a new second story is to be added to the existing first level. Please indicate that the 1 hour rated RCMU partition is to be extended to the bottom of the deck of the new apartment unit to be added to the existing first level apartment.

Additionally at details 1/A1.1, 1/A1.2 and 2/A1.2 please indicate that the existing 1 hour rated 8" RCMU wall is to be extended to the bottom of the deck of the second story apartments.

16. OK

17. Provide elevations for all new toilet room and new kitchen plans.
RESUBMITTAL REVIEW COMMENTS:
Fix the doors at detail 5/A6.2 to be as per plan detail 3/A1.2.
END OF REVIEW
02/03/2012 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Comment not resolved. If moving the washer/dryer to one side of the closet and installing the washer box on the other side of the closet will result in the washer box being readily accessible for inspection and cleaning, show this configuration on the plans along with a note explaining the intent of this configuration. [Original comment: The laundry closets appear to be designed to accommodate a stacked washer/dryer; verify that the standpipe waste receptors for the clothes washers will be readily accessible for inspection and cleaning when the stacked washer/dryers are in place. Reference: Section 804.1, UPC 2006.]
02/03/2012 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved
02/10/2012 TERRY STEVENS ZONING REVIEW Denied 02/14/2012

Development Services Department
Zoning Review Section

Terry Stevens
Lead Planner

Comments:

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site plan. Additional comments may be forthcoming.
02/14/2012 PAUL MACHADO ENGINEERING REVIEW Approved