Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM03524
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/14/2011 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
11/14/2011 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
11/14/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
11/14/2011 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A01; FLOOR PLAN: PROVIDE ENLARGED PLANS OF THE RESTROOMS, INDICATING ALL CRITICAL TURNING RADII AND CLEARANCES. 2. SHEETS G01, G02, AND G03: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. REVISE. |
11/14/2011 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
11/14/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
11/15/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the duct insulation per Section 503.2.7, IECC 2006, as amended by the City of Tucson. 2. Provide calculations demonstrating adequate ventilation. Reference: Section 403.3, IMC 2006, as amended by the City of Tucson. 3. Revise the size of the condensate drains in accordance with Section 307.2.1, IMC 2006, as amended by the City of Tucson. |
11/15/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Clarify which plumbing code has been used for this design; the water and waste fixture units refer to the IPC but the reference code on sheet A00 calls out the UPC. This review has been made using the 2006 UPC. 2. Detail S01/P-3 shows a hot water recirculation system. Coordinate the detail with the proposed plumbing plan. Reference: section 103.2.3, UPC 2006. (Note: a vacuum relief valve is required for the proposed installation. Reference: Section 608.7, UPC 2006. 3. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006. 4. The 3" drain pipe downstream of the floor drains is served by a 2" wall cleanout. Provide cleanouts sized per Section 707.11, UPC 2006. |
11/15/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
11/15/2011 | WMOTTO1 | FIRE | REVIEW | Approved | |
11/21/2011 | GERRY KOZIOL | WWM | REVIEW | Approved |