Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM03523
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/02/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | GENERAL 1. Please provide structural calculations for the 1 new roof top mounted HVAC unit. 2. Please provide special inspection certifications for the inspections listed in the Conditions portion of the permit application. Please review and approve the list provided or make modifications as required. SHEET A1.0 3. Does the existing door in the lower right hand corner have panic hardware? If not please provide as per the 2006 IBC, Section 1008.1.9. SHEET A1.1 4. The sink in the break room needs to be 34" a.f.f. as required by ICC/ANSI 117.1, Section 606.3. 5. At the lobby counter, please provide for an accessible counter as required by ICC/ANSI 117.1, Section 904. a. Notes 8 and 17 are contradictory to each other with mounting heights specified as 36" and 42". Shouldn't they be the same and at accessible heights? 6. Please show how the required clearances for a drinking fountain are accomplished with this alcove design. Please reference ICC/ANSI 117.1, Section 602. a. Please provide a large scale details (plan and elevation) of the drinking fountain alcove showing all accessible dimensions both horizontal and vertical. SHEET A1.3 7. Details 1 and 2: Please show all required accessible dimensions. 8. Detail 1: The urinal alcove needs to be 3'-0" wide as per ICC/ANSI 117.1, Sections 605 and 305. 9. Please provide large scale toilet elevations showing all required accessible dimensions, clearances, accessories and fixtures. SHEET S3.0 10. Calc sheet number 5 calls for 1.5 X 9.25 X 11'-0" @ 24" o.c. rafters. Drawings show 2 x 8 @ 16"o.c. Please reconcile. 11. Calcs call for 5.125 x 16.5 beam at reference marks 17/5.0 and 5/S5.0 on detail 1/S3.0. Please show this beam on detail 1/S3.0, roof framing plan. 12. Show size of scabbed on rafters cantilevered at entrance as per page 7 of the calcs, 1 1/2 x 9.25 x 20'-0". END OF REVIEW |
| 02/06/2012 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 02/08/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Demonstrate energy code compliance for the addition to the building envelope using calculations based on the current code. Provide sufficient detail on the drawings to evaluate the energy compliance of the building addition. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. 2. Show the size, routing, and termination of the condensate drain for AC-1A. Reference: Section 307.2, IMC 2006 as amended by the City of Tucson. 3. Revise the provided ventilation calculations using appropriate room descriptions (e.g. classroom instead of office) and justifying room populations that are not supported by Table 403.3, IMC 2006. Reference: Section 403.3, IMC 2006, as amended by the City of Tucson. 4. Show that the total amount of ventilation air introduced by the HVAC system is sufficient to supply the air required for transfer to the restrooms and for ventilation of the other spaces being served by the HVAC system. Reference: Sections 403.2.2 and 403.3.3, IMC 2006. 5. Provide calculations to show that the common ventilation system (i.e. multiple occupancy types served by a single air handler) is sized in accordance with Section 403.3.2, IMC 2006. 6. Revise the mechanical design as required to avoid using the corridor as a return air duct (e.g. AC-5). Reference: Section 601.2, IMC 2006. |
| 02/08/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 02/09/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide structural calculations to show that the proposed water heater is safely supported from the building structure. Clarify the wall construction; detail 3/P2.0 calls out wood studs but detail 15/A6.0 specifies metal stud construction. Reference: Sections 106.3.1 and 301.2, IPC 2006. 2. Provide specifications and listing information for the "Insta-hots" serving the lavatories. Reference: Sections 303, 501.5, 501.6, and 501.8, IPC 2006 and Section 504.3, IECC 2006. 3. Provide tempered water for the lavatories using approved devices conforming to ASSE 1070. Reference: Section 416.5, IPC 2006. 4. The plumbing design for this activity is based on the 2006 IPC but the water pipe sizing calculations have been done using the method shown in Chapter 6, UPC 2006. Revise the water pressure calculations to include the pressure drop due to the reduced pressure backflow preventer. Reference: Section 604.1, IPC 2006 and Section 610.0, UPC 2006. 5. Correct the New Fixture Schedule to reflect that water-free urinals do not have 0.5 supply fixture units but do have 0.5 drainage fixture units. Reference: Table 709.1, IPC 2006. 6. Provide cleanouts sized per Section 708.7, IPC 2006 (see the 4" horizontal drain from the water closets in the women's restroom, the 3" horizontal drain for the water closets north of the 4" horizontal drain, the 2" cleanout for the 3" horizontal drain from the mop sink, and the 3" and then the 4" horizontal drain from the north restrooms). |
| 02/10/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T11CM03523 8961 E Tanque Verde, TI Church and Add 1. Provide Fault Current Values at service and at panels. 2. Provide 2006 IECC Budget Lighting Compliance calculations, COM-CK ok. 3.Provide compliance check with City of Tucson Outdoor Lighting Ordinance # 10035. 4.See Mechanical Review item #4, requires electrical tie in. 5. Not all exit lighting tied into circuitry. Ray T Majuta Elect Pln Review, PDSD, C of Tuc, 2/12/12 Ray.majuta@tucsonaz.gov |
| 02/29/2012 | STEVE SHIELDS | ZONING | REVIEW | Approv-Cond | REMOVE DEVELOPMENT PACKAGE STAMP FROM ALL BUILDING PLAN SHEETS. |
| 03/06/2012 | GERRY KOZIOL | WWM | REVIEW | Approved |