Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM03454
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/04/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 11/04/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide a mechanical design for the new hood system. |
| 11/04/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | Electrical -- electrical sheet shows a 400 amp main disconnect feeding a 200 amp panel, with one existing 200 amp panel being removed,please clarify. Ray T Majuta PDSD CoF Tucson 11/4/11 |
| 11/04/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 11/04/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a waste and vent riser diagram. 2. Contact Doug Kirkland (443-6202) to determine which fixtures must be connected to the grease intercepter. 3. The prep sink, the condensate from the ice maker, and the ice melt from the ice maker shall be indirectly wasted. 4. Show the revisions to the gas piping on the plumbing drawing. Include all of the gas loads and the developed pipe length from the gas meter to each gas load. |
| 11/04/2011 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
| 11/04/2011 | RONALD BROWN | ADA | REVIEW | Passed | |
| 12/02/2011 | DROBEY1 | WWM | REVIEW | Needs Review | |
| 12/02/2011 | DROBEY1 | ZONING | REVIEW | Needs Review | |
| 12/02/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 12/02/2011 | DROBEY1 | FIRE | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/02/2011 | DELMA ROBEY | OUT TO CUSTOMER | Completed |