Review Date Reviewer's Name Type of Review Description Status Comments
11/15/2011 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
11/15/2011 GERRY KOZIOL WWM REVIEW Approved
11/15/2011 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
11/15/2011 LOREN MAKUS ENGINEERING REVIEW Approved
11/18/2011 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved
11/18/2011 ROBERT SHERRY WATER REVIEW Approved
11/21/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Comment not resolved. Detail 2/M1.0 calls for the contractor to evaluate the existing gas piping system and modify it to accommodate the new gas load; this constitutes the practice of engineering. Provide complete plans of the proposed revisions to the gas distribution system. The plans shall include showing how the existing gas piping system will be modified and provide sufficient information to determine if the design meets the requirements of the plumbing code. Reference Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. [Original comment: Provide a natural gas piping design, including the piping layout on a floor plan and a natural gas schematic showing the sizes, loads and developed lengths of the piping. Reference: Sections 103.2.3 and 1217.0, UPC 2006.]
2. Revise the water heater detail to show the vacuum relief valve installed per the manufacturer's listing information (i.e. on the cold water inlet and with no valves located between the vacuum relief and the storage tank). [Original comment: Provide a vacuum relief for storage-type water heaters located above any fixture outlets. Install the vacuum relief per the manufacturer's listing information (i.e. on the cold water inlet and with no valves located between the vacuum relief and the storage tank). Reference: Sections 304.0 and 608.7, UPC 2006.]
3. Show the installation of a cleanout for the mop sink. [Original comment: Provide upper terminal cleanouts on horizontal drainage pipes exceeding 5 feet in length (horizontal drain lines serving sinks require cleanouts regardless of length). Reference: Section 707.4, UPC 2006.]

Final Status