Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM03395
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/27/2011 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
10/27/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference: Section 503.2.7, IECC 2006, as amended by the City of Tucson. 2. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top units. Reference: Section 302.1, IMC 2006. 3. Show the size, routing, and termination of the condensate drains. Reference: Section 307.2, IMC 2006 as amended by the City of Tucson and Section 814.0, UPC 2006. |
10/27/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T11cm03395 4362 N Oracle 1. Provide size of conductors from transformer to Panel L, include ground and conduit size. 2. Circuits L-31 and 33 are used but marked spare in panel. 3. Circuits L-25 and 27 not on plan but on panel schedule. 4. List size of transformer ground. Ray T Majuta Elect Pln Ck PDSD, COT, 11/27/11 Ray.majuta@tucsonaz.gov |
10/27/2011 | ROBERT SHERRY | WATER | REVIEW | Denied | Show the size and location of both the water meter and the reduced pressure backflow preventer assembly. Reference Chapter 27, Article V, Section 27-76 (a), Tucson Code. http://www.tucsonaz.gov/water/docs/backflow-ord.pdf |
10/27/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a natural gas piping design, including the piping layout on a floor plan and a natural gas schematic showing the sizes, loads and developed lengths of the piping. Reference: Sections 103.2.3 and 1217.0, UPC 2006. 2. The applicable codes for all commercial plumbing projects are the 2006 Uniform Plumbing Code with Local Amendments and the 2006 International Plumbing Code. 3. Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 103.2.3, UPC 2006. 4. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006. 5. Provide a vacuum relief for storage-type water heaters located above any fixture outlets. Install the vacuum relief per the manufacturer's listing information (i.e. on the cold water inlet and with no valves located between the vacuum relief and the storage tank). Reference: Sections 304.0 and 608.7, UPC 2006. 6. Include the static lift and the minimum residual water pressure when performing the water pressure calculations. Reference: Sections 608.1 and 610.1, UPC 2006. 7. Provide upper terminal cleanouts on horizontal drainage pipes exceeding 5 feet in length (horizontal drain lines serving sinks require cleanouts regardless of length). Reference: Section 707.4, UPC 2006. |
10/28/2011 | MARTIN BROWN | FIRE | REVIEW | Approved | |
10/31/2011 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
10/31/2011 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A1.0; PLAN D2: THE RESTROOM ON THE RIGHT HAS AN ELEVATION NOTED AS B2OPP/A4. REVISE THE SHEET NUMBER. 2. SHEET A4.0; FINISH PLAN: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. REVISE THE SECTION CUTS. 3. SHEET A6.0; SECTIONS A1 AND C1: DETAIL B1/A7.1 (4 LOCATIONS) SHOULD BE REVISED TO C1/A7.1. VERIFY. 4. SHEET A6.1; ELEVATIONS B1 THROUGH B4: LOCATE THE PLUMBING FIXTURES AND ACCESSORIES PER THE ICC/ANSI A117.1-2003, CHAPTER 6. INCLUDE ELEMENT LENGTHS, HEIGHTS, ETC. |
10/31/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
11/15/2011 | CPIERCE1 | WWM | REVIEW | Needs Review | |
11/15/2011 | CPIERCE1 | ENGINEERING | REVIEW | Needs Review |