Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM03177
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/04/2011 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
10/04/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide information on the sequence of operation for the restroom exhaust fans to show that all of the air supplied to the restrooms will be exhausted. Reference: Section 403.2.1 (4), IMC 2006. 2. Provide calculations demonstrating adequate ventilation. Reference: Section 403.3, IMC 2006, as amended by the City of Tucson. |
10/04/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1. All lettering and numbering to be minimum 3/32" per Submittal Requirements. 2. See Mechanical Plans Examiner comments regarding supply air and exhaust, must be so that when air supplied exhaust on, show electrically how this will be done. Ray T Majuta, Elect Pln Ck, PDSD, C of Tuc, 10/3/11 Ray.majuta@tucsonaz.gov |
10/04/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
10/04/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Please revise all sheets that have lettering sizes (upper and lower case) less than 3/32" in height. 2. Please provide last approved site plan. 3. Please provide structural calculations and details for the wall mounted water heater. END OF REVIEW |
10/04/2011 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
10/04/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Show how the mounting shelf for the water heater is connected to the building structure. Reference: Sections 106.3.1 and 301.2, IPC 2006. 2. Provide a vacuum relief valve for bottom-fed storage-type water heaters. Reference: Section 504.2, IPC 2006. 3. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference: Section 504.3, IECC 2006. |
10/04/2011 | DAVE MANN | FIRE | REVIEW | Approved | |
10/04/2011 | RONALD BROWN | ADA | REVIEW | Passed | |
10/04/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
10/21/2011 | GBONILL1 | WWM | REVIEW | Needs Review |