Permit Number: T11CM03166
Parcel: 12510003G

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T11CM03166
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/14/2011 RONALD BROWN ADA REVIEW Passed
10/17/2011 DAVE MANN FIRE REVIEW Denied Fire Cooments:

The fire riser must be relocated or repiped so the underground does not run under the building. See NFPA 13, 2002.
10/24/2011 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied SHEET A1.0
1. Insure panic hardware at exterior doors as per Section 1008.1.9.
2. At partition schedule PT-2, 3 AND 5 calls for diagonial braces a 8' io.c. while detail 14/A4.2 cals for diagonal braces at 4'-0" o.c. Please revise partition sxchedule PT-2, 3 and 5 to be 4'-0" o.c.
SHEET S1.1 AND S1.2
3. Provide special inspection certifications as per tables 1704.3, 1704.4 and 1704.5.1.
4. For additional plan review purposes, please provide a deferred submittal summary letter to the building official, Mr. Ron Boose.
SHEET S2.1
5. At the footing schedule for footing F3, reinforcing is shown as 4#5s while the calcs, page 35 calls for 5#5s. Please reconcile.
END OF REVIEW.
10/24/2011 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
10/26/2011 DAVID RIVERA ZONING REVIEW Denied Zoning has reviewed the building plans but cannot approve them on this review. Provide a copy of the approved development plan if available. Zoning will re-review the building plans on the next submittal to ensure compliance with the approved and stamped development plan. (Zoning will not approve the building plans until the DP is approved by all CDRC reviewers and stamped by the CDRC Manager.)
11/02/2011 LOREN MAKUS ENGINEERING REVIEW Approved
11/02/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide site drawing showing the size, route, cleanouts, and slope of the building sewer. Reference: Section 103.2.3, UPC 2006.
2. The maximum flow rates for plumbing fixtures shall be consistent with ARS Title 45, Chapter 1, Article 12, 45-313. (See text at: http://www.azleg.state.az.us/ArizonaRevisedStatutes.asp). In addition, accessible metering faucets shall remain open for a minimum of 10 seconds. Reference: Section 402.1, UPC 2006, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-2003.
3. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006.
4. The temperature and pressure relief piping shall not terminate into a water heater pan (keynote 18, sheet P1.0). Reference: Section 508.5, UPC 2006.
5. Provide a water service shut off valve at the building entrance. Reference: Section 605.2, UPC 2006.
6. Provide water pressure and water pipe sizing calculations. Reference: Section 610.1, UPC 2006.
7. Provide an additional cleanout for drainage pipe exceeding 100-feet in developed length. Reference: Section 707.4, UPC 2006.
8. Revise the slope of the horizontal drainage piping to comply with the requirements of Section 708.0, UPC 2006.
11/02/2011 ROBERT SHERRY WATER REVIEW Denied Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 103.2.3, UPC 2006.
11/03/2011 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted (i.e. exhaust fan shall operate whenever supply air is delivered to the restroom during business hours). Reference: Section 403.2.1 (4), IMC 2006.
2. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference: Section 503.2.7, IECC 2006, as amended by the City of Tucson.
11/07/2011 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied T11CM03166
3497 E Broadway Bl

This set of plans is missing the 2006 IECC Budget Lighting Calculations, must be included in order to approve.

Ray Majuta
Elect Plan Review
PDSD, CoT
11/9/11
Ray.majuta@tucsonaz.gov
11/14/2011 GERRY KOZIOL WWM REVIEW Denied NEED 5TH FLOOR WW CREDIT EVALUATION IF APPLICABLE- 740-6602 OR 740-6606

Final Status

Task End Date Reviewer's Name Type of Review Description
12/06/2011 FERNE RODRIGUEZ OUT TO CUSTOMER Completed
12/06/2011 SUE REEVES REJECT SHELF Completed