Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - SITE
Permit Number - T11CM03131
Review Name: RESUBMITTAL - SITE
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/27/2011 | ANDREW CONNOR | LANDSCAPE | REVIEW | Denied | Landscape / NPPO can not approve plans until SCZ review is complete. Include approval documentation with next submittal. |
10/27/2011 | ANDREW CONNOR | NPPO | REVIEW | Denied | Landscape / NPPO can not approve plans until SCZ review is complete. Include approval documentation with next submittal. |
11/03/2011 | MICHAEL ST. PAUL | ZONING | REVIEW | Denied | CDRC TRANSMITTAL FROM: Michael St.Paul, Planning Technician PROJECT: T11CM03131 (T11SA00393 SCZ) 10355 East 29th Street Parking structures with photovoltaic systems on roof Religious Use TRANSMITTAL: November 3, 2011 COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Land Use Code (LUC) and Development Standards were addressed. This site review is based upon Development Standards 2-02 (DS 2-02). 1.) A Scenic Corridor Zone (SCZ) has also been submitted for review (T11SA00393). Approval of the SCZ plan is required for final approval of this site plan. 2.) The site is located in the SR zone (LUC Section 2.2.4). The Development Designator for Religious Use in this zone is "6" (LUC Sections 2.2.4.2.C.1 & 3.2.3.2.A). The Perimeter Yard Indicator is FF (LUC Sections 3.2.3.2.A & 3.2.6.4). 3.) Identify the zoning of the adjacent parcels (DS 2-02.2.1.A.28). 4.) Provide the street names on the site plan (DS 2-02.2.1.A.18). 5.) Dimension the right-of-way (ROW). Include the Major Streets and Routes (MS&R) information with the future ROW and curb locations on the site plan (DS 2-02.2.1.A.19). (See comments for the SCZ submittal.) 6.) Provide the existing and future sight visibility triangles (SVTs) on the site plan (DS2-02.2.1.A.10). 7.) Dimension the points of egress and ingress on the site plan (DS 2-02.2.1.A.11). 8.) Provide a dimensioned parking space detail for both the standard and handicapped parking spaces (DS 2-02.2.1.A.8). 9.) Provide the information required for the Scenic Corridor Zone on this site plan. (See the comments for T11SA00393.) 10.) There may be additional comments for information provided or required with subsequent submittals. |