Permit Number: T11CM03090
Parcel: 13220003A

Address:
3401 E GAS RD

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T11CM03090
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/06/2011 MARTIN BROWN FIRE REVIEW Approved
10/07/2011 STEVE SHIELDS ZONING REVIEW Approved
10/07/2011 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Approved
10/07/2011 LEERAY HANLY BUILDING-COMMERCIAL REVIEW Approved
10/27/2011 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference: Section 503.2.7, IECC 2006, as amended by the City of Tucson.
2. Specify the minimum insulation for the heating hot water piping to be used on this project. Reference: Section 503.2.8, IECC 2006, as amended by the City of Tucson.
10/27/2011 ROBERT SHERRY WATER REVIEW Approved
10/28/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. The branch piping sizes called out for the water closet flush valves (3/4") will result in water velocities greater than 8 FPS. Limit the water velocity to less than 8 FPS for the copper piping. Reference: Sections 610.12 and A 6.1, UPC 2006 and IS 3-2003, Section 2.6.
2. Calculate the water demand using the fixture units shown in Table A-2, UPC 2006 (e.g. 5.0 WFU for a flush valve water closet, not 2.5 WFU). Reference: Section 610.3, UPC 2006.
3. Clarify the size of the water supplies to the mop sink (P-5) and to the drinking fountain (labeled as both P-6 and P-7). Reference: Section 103.2.3, UPC 2006.
4. Provide the rim elevation of the next upstream sanitary manhole or cleanout in the private sewer and the first floor elevation of the additions. Determine the need for a backwater valve per Section 710.1, UPC 2006, as amended by the City of Tucson.
5. Provide a cleanout at the junction of the building drain and the building sewer (details 3/P-1 and 1/P-2). Reference: Sections 719.1 and 719.2, UPC 2006.
6. Provide a cleanout at the base of the primary roof drain leader prior to its connection with the horizontal storm drain. Reference: Section 1101.12.2, UPC 2006.
10/31/2011 GERRY KOZIOL WWM REVIEW Denied need to clairify demo drawings per demo schedules for connection fee credit. (I.E. locations of exsisting showers removed. Locations & sizes of all FD's & FS's removed etc.)
11/04/2011 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
11/09/2011 CPIERCE1 OUT TO CUSTOMER Completed
11/09/2011 SUE REEVES REJECT SHELF Completed