Review Status: Completed
Review Details: SITE
Permit Number - T11CM03081
Review Name: SITE
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/12/2011 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: 8800 E. Broadway Blvd T11CM03081 Site Plan (1st Review) TRANSMITTAL DATE: October 12, 2011 COMMENTS: Please resubmit revised drawings and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. This site plan was reviewed for compliance with the City of Tucson Development Standards (D.S.) and Land Use Code (LUC) for full code compliance for the areas of expansion and any changes to the site only. 2. D.S. 2-02.2.1.A.8 Provide a dimension for the wheel stop location see LUC Section 3.3.6.8.C. 3. D.S. 2-02.2.1.A.9 Short Term Bike Rack detail shows 27 3/8" from center of rack to center of rack. Note B calls out 48" between racks. Per LUC Section 3.3.9.2.B.6 and 3.3.9.5.B revise the detail to show the correct 48" between racks. 4. D.S. 2-02.2.1.A.12 Provide a width dimension from the proposed accessible vehicle parking space sign to the building. Per D.S. 2-08.5.1.A all sidewalks will be a minimum four (4) foot wide. 5. D.S. 2-02.2.1.A.12 The proposed three (3) sidewalk shown south of the proposed addition does not meet the requirements of D.S. 2-08.5.1.A. A Development Standard Modification Request (DSMR) must be applied for and approved prior to approval of the site plan is approved. If the DSMR is approved provide the following information of the site plan; DSMR number, date of approval, what was modified, and conditions of approval. 6. D.S. 2-02.2.2.A.3 Provide a floor area ratio (FAR) calculation on the plan, see LUC Section 3.2.11. 7. D.S. 2-02.2.2.A.4 Provide a vehicle and bicycle parking calculation that includes the required and provided on the plan. As it appears parking spaces are being removed from the east end of this project the calculation needs to include the entire shopping center. 8. Depending on how the above comments are addressed additional comments may be forth coming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan. |
10/12/2011 | RBROWN1 | ADA | REVIEW | Passed | |
10/12/2011 | RONALD BROWN | H/C SITE | REVIEW | Approved | |
10/13/2011 | ANDREW CONNOR | LANDSCAPE | REVIEW | Denied | Ensure that all Zoning and Engineering comment are addressed. Additional comments may apply |
10/13/2011 | ANDREW CONNOR | NPPO | REVIEW | Approved | |
10/13/2011 | JASON GREEN | ENGINEERING | REVIEW | Needs Review | |
10/13/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
10/14/2011 | CPIERCE1 | FIRE | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/14/2011 | CPIERCE1 | OUT TO CUSTOMER | Completed |