Permit Number: T11CM03080
Parcel: 12112001B

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T11CM03080
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/31/2012 CAGUILA1 ZONING REVIEW Needs Review
01/31/2012 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved
01/31/2012 ROBERT SHERRY WATER REVIEW Approved
01/31/2012 CAGUILA1 WWM REVIEW Needs Review
09/26/2011 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied T11CM03080
5445 E Speedway

1. LED lighting used to illuminate exterior, does not provide enough information to review as per City of Tucson Outdoor Lighting Ord #10035.
2. Are the power units for each section pf LED lighting 3000
lumens or below?
3. Is total exposed lumen value below the allowed percentage of output allowed per ODLO #10035,Table 5.1 ?
4. Is the addition of the lighting less than 10 % per Section
3.2 of the ODLO #10035.
Provide information on how this installation complies with the Outdoor Lighting Ordance # 10035.

Ray T Majuta,
PDSD, City of Tucson,
Electrical Plan Review,
9/26/11
Ray.majuta@tucsonaz.gov
09/26/2011 PAUL MACHADO ENGINEERING REVIEW Approved
09/26/2011 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET A1.1; KEY NOTES: DID NOT FIND C1, C2, OR C3 ON THE PLAN. VERIFY.
2. SHEETS A2.0 AND A2.1; KEY NOTES: DID NOT FIND C2 OR C3 ON THE PLAN. VERIFY.
3. A3.0; NEW TRELLIS SYSTEM: STRUCTURAL DESIGN MUST BE PROVIDED DURING THIS REVIEW FOR THE TRELLIS. A NOTE INDICATES THIS INFORMATION ON THE DRAWINGS IS FOR INTENT ONLY. PROVIDE CALCULATIONS AND DRAWINGS.
4. SHEET A3.4; SECTIONS: PROVIDE STRUCTURAL CALCULATIONS FOR THE SUPPORT OF THE NEW SIGN AND INCLUDE THEM ON THE DRAWINGS.
5. SHEET S3.2; SECTIONS 1, 2, AND 3: INDICATE ON THE DRAWINGS HOW THE NEW CONSTRUCTION IS CONNECTED TO THE EXISTING AND/OR NEW CONSTRUCTION.
6. SHEET S4.0: INDICATE HOW THE NEW HEADERS ARE CONNECTED TO THE STUDS AT BEARING.
7. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
09/26/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Approved
09/26/2011 DAVE MANN FIRE REVIEW Approved
09/26/2011 ERIC NEWCOMB ADA REVIEW Passed
09/26/2011 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed