Permit Number: T11CM03076
Parcel: 137055300

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T11CM03076
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/11/2011 DAVE MANN FIRE REVIEW Approved
10/21/2011 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. At detail 2/A3, attach the diagonal bracing directly to the metal studs of the partition. Provide diagonal bracing at every 4' o.c.
2. Please provide dual level water dispenser as per the 20906 IBC, Section 1109.5 and ICC~ANSI 117.1, Section 602.4.
END OF REVIEW
10/25/2011 RMYERS1 WATER REVIEW Denied 1. Provide the site utility plan showing the location of the reduced pressure backflow assembly on the drawings, specify the reduced pressure backflow assembly being installed, and indicate the size of the assembly. Reference COT Ordinance 9976,
10/25/2011 RICK MYERS PLUMBING-COMMERCIAL REVIEW Denied Permit # T11CM03076
Project: TI: Hair Salon (Style America)

City of Tucson Development Services
Mechanical/Plumbing Plan Review

Date: 10/27/11
Address:
Responsible Engineer:

Plan Reviewer: Robert W. Sherry, PE

Applicable Codes:

IMC 2006 UPC 2006
IECC 2006 IBC 2006
IFGC 2006 IFC 2006

Water Comments:

Provide a site utility plan showing the location and sizes of the water meter and the reduced pressure backflow assembly serving this suite. Reference: Chapter 27, Article V, Section 27-76 (a), Tucson Code, http://www.tucsonaz.gov/water/docs/backflow-ord.pdf

Plumbing Comments:

1. See waste and vent piping riser diagram, sheet MP-2. Three inch branch from main, reducing to one and one half inches at the floor, for the dispensary sink. Reference: Table 7-5, 2006 UPC. Minimum size waste for a sink is two inch. Reference: Section 707.4, exception one, 2006 UPC. A horizontal branch from the main feeding a sink requires a cleanout. See: waste and vent piping riser diagram, sheet MP-2. Horizontal branch from the main over five feet in length requires a cleanout. Diagram shows three inch under the slab, but the above grade piping for the two shampoo bowls is unclear. Include the size of the drainage piping for the two shampoo bowls, and the wall cleanout.
2. See: plumbing plan MP-1. Connections to existing water piping. Provide water calculations showing how existing ¾-inch cold water supply will feed the new water fixture supply demand. Clarify the proposed connection to an existing ½-inch hot water supply.
3. Provide the minimum plumbing facilities required by Table 2902.1 and Section 2902.2, IBC 2006, for a business occupancy (i.e. a drinking fountain). See also, Section 1109.5.1, IBC 2006.

Mechanical Comments:

1. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the new roof top unit, RTU-2. Reference: Section 302.1, IMC 2006.
2. Show the size, routing, and termination of the condensate drain for the new rooftop unit, RTU-2. Reference: Section 307.2, IMC 2006 as amended by the City of Tucson and Section 814.0, UPC 2006.
3. Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted. Reference: Section 403.2.1 (4), IMC 2006.
4. Revise the ventilation calculations, matching the occupation classifications from Table 403.3, IMC 2006 with the occupancy descriptions shown on the drawing (e.g. beauty salon, with 25 CFM per person and 25 people per 1,000 square feet). Reference: Sections 403.3 and 403.3.2, IMC 2006.
5. Provide calculations to show that the common ventilation system is sized in accordance with Section 403.3.2, IMC 2006.
6. The roof framing and roof deck of the shell building are constructed of wood. Materials exposed in plenums shall conform to Section 602.2.1, IMC 2006.
10/27/2011 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the new roof top unit, RTU-2. Reference: Section 302.1, IMC 2006.
2. Show the size, routing, and termination of the condensate drain for the new rooftop unit, RTU-2. Reference: Section 307.2, IMC 2006 as amended by the City of Tucson and Section 814.0, UPC 2006.
3. Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted. Reference: Section 403.2.1 (4), IMC 2006.
4. Revise the ventilation calculations, matching the occupation classifications from Table 403.3, IMC 2006 with the occupancy descriptions shown on the drawing (e.g. beauty salon, with 25 CFM per person and 25 people per 1,000 square feet). Reference: Sections 403.3 and 403.3.2, IMC 2006.
5. Provide calculations to show that the common ventilation system is sized in accordance with Section 403.3.2, IMC 2006.
6. The roof framing and roof deck of the shell building are constructed of wood. Materials exposed in plenums shall conform to Section 602.2.1, IMC 2006.
11/01/2011 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied T11CM03076
5271 S Santa Cruz
Cost Cutters

1. Mechanical Plans Examiner requiring that in rest rooms the supplied air to be ehausted. Need to see how this will be accomplished electrically.
2. Provide total load on service plus this TI, in order to verify total load on service.

Ray T Majuta
Elect Pln Review
PDSD,COT
11/1/11
Ray.majuta@tucsonaz.gov
11/04/2011 GERRY KOZIOL WWM REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
12/06/2011 CPIERCE1 OUT TO CUSTOMER Completed
12/06/2011 SUE REEVES REJECT SHELF Completed