Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM03053
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/22/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
09/22/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide energy code compliance calculations for the building envelope; use the climate zone for Pima County < 4,000 feet. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. 2. Provide structural calculations to verify that the roof is capable of supporting the roof top unit. Reference: Section 302.1, IMC 2006. |
09/22/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the size of the provided scupper to comply with the requirements of Section 1101.11.2.1, UPC 2006. 2. Show how overflow roof drainage is to be provided. Reference: Section 1101.11.2, UPC 2006. |
09/22/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
09/22/2011 | JASON GREEN | ENGINEERING | REVIEW | Needs Review | |
09/27/2011 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. GENERAL: PROVIDE ARCHITECTURAL SPECIFICATIONS AS REQUIRED. 2. GENERAL: PROVIDE STRUCTURAL CALCULATIONS (VERTICAL AND LATERAL) FOR THIS PROJECT. 3. GENERAL: PROVIDE STRUCTURAL NOTES ON THE DRAWINGS FOR MATERIALS, LOADINGS, FOUNDATIONS, ETC. |
09/27/2011 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
09/27/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
10/18/2011 | DROBEY1 | WWM | REVIEW | Needs Review | |
10/18/2011 | DROBEY1 | ZONING | REVIEW | Needs Review | |
10/18/2011 | DROBEY1 | FIRE | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/18/2011 | DELMA ROBEY | OUT TO CUSTOMER | Completed |