Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T11CM02976
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/26/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. At detail 11/D2, run the 1/2 hour protection continously through the floor plenum or provide solid blocking from ceiling to floor deck at his juncture. 2. Please indicate that all units are to be Type "B" units as per the 2006 IBC, Section 1007.6.2.1.2. 3. For the purpose of assessing additional plan review fees, please submit a letter to the building official, Mr. Ron Boose, summarizing all the items intended for a deferred submittal review. 4. At Detail 1/S-2: a. Insure the top stair landing is in complinace with the 2006 IBC, Section 1009.4, Stairway Landing Width. b. The top of the wall mounted handrail must comply with ICC/ANSI, Section 505.10.2, 12" extension. 5. Please provide key plans in the structural calculations as follows: a. Foundation Plan b. Floor Framing Plan c. Roof Framing Plan END OF REVIEW |
| 09/27/2011 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | Laith Alshami, Engineering and Floodplain Review, 10/06/2011, Building plans shall be approved after the site plan is approved. |
| 09/30/2011 | TERRY STEVENS | ZONING | REVIEW | Denied | 09/30/2011 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site plan. Additional comments may be forthcoming. |
| 10/05/2011 | ROBERT SHERRY | WATER | REVIEW | Denied | Reduced pressure backflow prevention assemblies are required to be installed in locations accessible to Tucson Water. Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, http://cms3.tucsonaz.gov/sites/default/files/water/docs/backflow-ordinance.pdf |
| 10/06/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Coordinate Mechanical Notes #7 and #12; the notes are in conflict and note #7 also refers to the 2003 IECC. 2. Provide energy code compliance calculations for the building envelope; use the climate zone for Pima County < 4,000 feet. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall include the SHGC for the fenestration and shall be consistent with the values used for the energy calculations. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. 3. Clarify how the secondary drain systems for the fan coil units comply with the requirements of Section 307.2.3 IMC 2006. 4. Show how the fan coil units are receiving and filtering return air. Reference: Sections 605 and 918.3, IMC 2006. |
| 10/06/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T11CM02976 3101 E Fairmount 1,2,3,4 Hope Senior Housing Electrical denied, Sheet E-3 showing service and panel schedules not included in either set of plans. Ray T Majuta Elect Pln Ck PDSD, C of Tucson 10/11/11 Ray.majuta@tucsonaz.gov |
| 10/06/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Complete the waste and vent riser diagrams (i.e. include the kitchen sinks on the 2nd floor). Reference: Section 103.2.3, UPC 2006. 2. Revise the water pressure calculations to include: the pressure drop due to the presence of the backflow assembly; and the total lift from the water meter (12" below grade) and the highest water outlet (a shower nozzle on the second floor). Reference: Section 610.0, UPC 2006. 3. Provide cleanouts sized per Section 707.11, UPC 2006 (i.e. a 3" pipe requires a minimum cleanout of 2.5"). 4. The rim elevation of the next upstream sanitary manhole for the western building sewer (2461.25') is less than 12" below the first floor elevation (2462.13'). Provide a backwater valve per Section 710.1, UPC 2006, as amended by the City of Tucson. Note that floors discharging from above the first floor shall not discharge through the backwater valve. See also, Section 904.1, UPC 2006 for venting requirements. 5. Provide the dimensions of the rainwater gutters and downspouts. Reference: Section 1106.0, UPC 2006. |
| 10/18/2011 | GERRY KOZIOL | WWM | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/27/2011 | CPIERCE1 | OUT TO CUSTOMER | Completed |
| 10/27/2011 | SUE REEVES | REJECT SHELF | Completed |