Permit Review Detail
Review Status: Completed
Review Details: OTHER
Permit Number - T11CM02971
Review Name: OTHER
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/15/2011 | DAVE MANN | FIRE | REVIEW | Denied | Per NFPA 13, canopy must contain fire sprinklers. Please add note showing fire sprinklers will be included, and a deferred submittal for sprinklers is forthcoming. |
| 09/28/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. There are no construction documents submitted in this package for the actual canopy i.e. specifications, elevations, connections, drainage plan and/or details. SHEET S200 2. There are four columns shown on the drawings and scheduled as C1-8" standard poles that are not identified on the calculations key plan page 6. These columns may be located by their referenced foundation mark: DF7, DF4, DF5 and DF6 as shown on the key plan. 3. The most Northerly located column on the drawing is scheduled as C1-8" dia. std. pipe column while the calcs, pages 6 and 8, call for a battered steel pipe. 4. As per the drawings, only 2 types of columns are scheduled whereas the calcs call for 3 types of columns, i.e. battered and non battered. Shouldn't 3 types be shown on the drawings? END OF REVIEW. |
| 09/29/2011 | RONALD BROWN | ELECTRICAL-COMMERCIAL | REVIEW | Passed | There are no electrical drawings. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/25/2011 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 10/25/2011 | SUE REEVES | REJECT SHELF | Completed |