Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Permit Number - T11CM02815
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/08/2011 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD Zoning Review Transmittal TO: Planning and Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: T11CM02814 2242 E. 4th Street TRANSMITTAL DATE: September 8, 2011 Proposed Project: Main House - Arizona Room addition. Sleeping Quarters - Carport addition COMMENTS: Site Plan OK D.D.O. required for: Perimeter yard setbacks from the proposed bath to the west perimeter yard property line. Per LUC Section 3.2.6.4, R-1 Zone, Development Designator "G", Perimeter Yard Indicator "AA" the required perimeter yard setback is 6.0' or 2/3 the height of the exterior wall. Main House - Arizona Room addition 1. Based on an exterior wall height of 8-6" the required perimeter yard setback from the proposed Arizona Room to the west property line is 6'-0, proposed setback is 4'-6". Sleeping Quarters - Carport addition 2. Based on an exterior wall height of 8-6" the required perimeter yard setback from the proposed Carport to the east property line is 6'-0, proposed setback is 4'-6". 3. Based on an exterior wall height of 8-6" the required perimeter yard setback from the proposed Carport to the south property line is 6'-0, proposed setback is 5'-6". Roof overhang of 3'-6" proposed therefore setback is measured to max of 2'-0" of roof overhang. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov (520) 837-4956 |
| 09/08/2011 | SSHIELD1 | NPPO | REVIEW | Passed | |
| 10/20/2011 | GBONILL1 | ENGINEERING | REVIEW | Needs Review | |
| 10/20/2011 | GBONILL1 | BUILDING-RESIDENTIAL | REVIEW | Needs Review |