Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM02791
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/29/2011 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Denied | 1) PP C-1: A) Please correct project data for this activity. This project is 1236 sq ft + 380 sq. ft. of mezzanine (IBC 1004.6); therefore strike reference to 3695 sq ft. B) Const. type IIA reference to exterior walls & projections as non-combustible does not seem relevant as all construction must be non-combustible. Delete reference or make relevant commentary as per table 601 of the IBC. C) Please define actual egress required for this project and clarify if it has been met. D) Clarify mezzanine area + floor area for scope of work and total floor area 2) Provide complete structural drawings to include mechanical closet off mezzanine. 3) provide accessible drinking fountain or point-of-use water cooler (Chapter 29 IBC) 4) Clarify locations of different partition types 5) Provide full details for guards & handrails at mezzanine starirs. Include all structural attachments and architectual dimensions. 6) For stairs from mezzaninines coordinate structural riser & tread dimensions with architectural details (7" max rise, 11" min run) 7) Provide dimensioned breakroom elevations for verification of compliance with ANSI 117.1. Not really a correction comment but just a question. Are CU 3-9 & 3-10 shown in correct location on pp M1.2? They appear flipped from FCU locations. |
08/29/2011 | LEERAY HANLY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
08/29/2011 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Provide an approved set of plans showing what has been designated as part of a "shell project" for reference. |
08/29/2011 | LHANLY1 | WATER | REVIEW | Approved | |
08/29/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
08/29/2011 | LEERAY HANLY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
08/29/2011 | LEERAY HANLY | ADA | REVIEW | Passed | |
10/05/2011 | GBONILL1 | WWM | REVIEW | Needs Review | |
10/05/2011 | GBONILL1 | ZONING | REVIEW | Needs Review | |
10/05/2011 | GBONILL1 | ENGINEERING | REVIEW | Needs Review | |
10/05/2011 | GBONILL1 | FIRE | REVIEW | Needs Review |