Permit Review Detail
Review Status: Completed
Review Details: SITE
Permit Number - T11CM02705
Review Name: SITE
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/29/2011 | DAVE MANN | FIRE | REVIEW | Approved | |
| 08/31/2011 | ANDREW CONNOR | NPPO | REVIEW | Approved | |
| 08/31/2011 | ANDREW CONNOR | LANDSCAPE | REVIEW | Denied | 1. Provide previous approved site and landscape plans for reference. 2. Provide a site plan that meets the requirements of D.S. 2-02.0 3. Ensure that all zoning comments and concerns are addressed 4. Additional comments may apply |
| 08/31/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Revise the site drawing to include the following information: a. the location and size of the water meter b. the location of the main water lines and fire hydrants c. the location of the gas meter (if one exists or is planned) d. the location and size of the public sanitary sewer e. the location of the building connection to the public sewer f. the location, invert, and rim elevation of all manholes and cleanouts g. the first floor elevation for the building Reference: City of Tucson Development Standard No. 2-01.0.0, Section 3.8 D and Section 103.2.3, UPC 2006. |
| 08/31/2011 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Chase Bank Expansion @Tanque Verde & Sabino Canyon T11CM02705 Site Plan (1st Review) TRANSMITTAL DATE: August 31, 2011 COMMENTS: Please resubmit revised drawings and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. Provide a site plan that meets the requirements of D.S. 2-02.0. No further building review will be done until a site plan has been submitted. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956. C:\planning\site\2011\t11cm02705 RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Site plan. |
| 08/31/2011 | JASON GREEN | ENGINEERING | REVIEW | Denied | Site Plan application denied until the applicant provides a site plan that meets all requirements of DS Sec.2-02. The site plan submitted with the building sheets does not accurately reflect all the requirements of DS Sec.2-02. A review could not be made since the information was not provided. |
| 09/07/2011 | LEERAY HANLY | H/C SITE | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/09/2011 | CPIERCE1 | OUT TO CUSTOMER | Completed |
| 09/09/2011 | SUE REEVES | REJECT SHELF | Completed |