Permit Number: T11CM02705
Parcel: 133152870

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T11CM02705
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/29/2011 DAVE MANN FIRE REVIEW Approved
08/31/2011 ROBERT SHERRY WATER REVIEW Approved
08/31/2011 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Chase Bank Expansion @Tanque Verde & Sabino Canyon
T11CM02705
Building Plan (1st Review)

TRANSMITTAL DATE: August 31, 2011


1. The building, plan has been reviewed by Zoning Review Section but cannot approve the plans until all zoning comments or concerns have been addressed.

2. Zoning can not approve the plans until a site plan is provided and approved.

3. Zoning will re-review the plans on the next submittal to insure compliance with the approved and site plan. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C:\planning\building\t11cm02705.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED:
08/31/2011 JASON GREEN ENGINEERING REVIEW Denied Building plan will be reviewed once an approved site plan is provided.
09/01/2011 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Approved ELECTRICAL APPROVAL BY DAN SANTA-CRUZ
09/01/2011 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 2. Provide energy code compliance calculations for the building envelope using the correct climate zone for Pima County < 4,000 feet. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006.
09/01/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Provide roof drainage calculations and plans. Include the contribution of the existing roof areas to the drainage requirements of the new roof areas in the calculations. Reference: Sections 1101, 1106 and 1107, IPC 2006.
09/07/2011 LHANLY1 WWM REVIEW Passed no new plumbing fixtures
09/07/2011 LEERAY HANLY BUILDING-COMMERCIAL REVIEW Approv-Cond pending authorization for minor redline of framing details on arch. pages.
09/07/2011 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
09/09/2011 CPIERCE1 OUT TO CUSTOMER Completed
09/09/2011 SUE REEVES REJECT SHELF Completed