Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T11CM02662
Parcel: 13216600A

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T11CM02662
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/22/2011 LEERAY HANLY BUILDING-COMMERCIAL REVIEW Denied 1) UNRESPONSIVE TO ORIGINAL COMMENT

"Provide actual cutsheets for Schletter Fix-V brackets. Calculations, A pages, S pages and roof sections do not all conform on size. The problem here may be that Schnieder documents from Schletter are for a different bracket."

Response was that Schletter would provide information...they have not.

2) UNRESPONSIVE TO ORIGINAL COMMENT

"Provide details for which "V" page applys to structural arrays C1 - C5.2 (A pages call them N-D)"

Response was that this informtion was provided on sheet S0.5. That is not a valid statement as S0.5 indicates these could use one of three racking layouts (v1.a , v1.b or v1.c)

3) INCOMPLETE RESPONSE TO ORIGINAL COMMENT

"Provide layout of Fix-V brackets on S pages to correspond to required # of brackets on "V" pages."

No information is included with plan set that indicates which Schletter layout should be used. Response also does not address Schletter layout for v1.a layout indicates fix-v brackets at 12" on center for an array that is 668" long which provides for the installation of 110 brackets (assuming 2 rows of brackets) but parts list indicates 440 brackets to be used.

4) INCOMPLETE RESPONSE TO COMMENT

"Provide layout or information for array N1-N3 racking where you intend to use more or less than the 16 panels array on pp V.02 (similar to pp s1.11 for building 1 would be excellent)"

No information has been provided to indicate which "V" page should be used for the layout of this racking system

Final Status

Task End Date Reviewer's Name Type of Review Description
10/19/2011 SUE REEVES APPROVAL SHELF Completed
10/19/2011 CINDY AGUILAR OUT TO CUSTOMER Completed