Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM02617
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/19/2011 | RONALD BROWN | ADA | REVIEW | Passed | |
08/22/2011 | GERRY KOZIOL | WWM | REVIEW | Denied | need 5th floor credit evaluation for removal of 15 showers- 1 clothes washer- 18 lavs - 18 toilets- DF'S- 1 mop sink- 1 lounge sink per demo drawings |
08/22/2011 | DAVE MANN | FIRE | REVIEW | Approved | |
08/24/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
08/24/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
08/24/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
08/25/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
08/25/2011 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
08/25/2011 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Denied | 1) CLARIFYING SCOPE OF WORK IN COVER SHEETS WOULD BE BENIFICIAL. SEPARATING WHAT YOU ARE TRYING TO DO WITH THE NEW CONSTRUCTION VS. WHAT IS EXISTING WOULD HELP RESOLVE SOME OF THE FOLLOWING COMMENTS. (PROVIDE COST OF CONSTRUCTION ANALYSIS SHOWING HOW MUCH IS BEING SPENT ON MAKING SPACE MORE ACCESSIBLE FOR WHAT APPEARS TO BE A CHANGE OF OCCUPANCY IN THIS AREA). 2) CLARIFY CODE ANALYSIS PP G1.2 a) HOW DO YOU GET TO NON SEPARATED USE? WHAT ABOUT THE I-1 PORTION OF BUILDING? b) WHAT DOES CORRIDOR EF & GH HAVE TO DO WITH ACTUAL BUILDING AREA? c) JUSTIFY OCCUPANT LOAD CALCULATIONS AND SQ. FOOTAGE OF OCCUPIABLE AREAS d) COORDINATE ACTUAL SQUARE FOOTAGE WITH WHAT IS SHOWN ON SITE PLAN e) THE DESIGN OCCUPANT LOAD FOR A B OCCUPANCY IS 1:100. INDICATE DESIGN OCCUPANT LOAD SEPARATELY FROM THOSE OCCUPANT LOADS USED TO DETERMINE EGRESS REQUIREMENTS FROM ACCESSORY SPACES SUCH AS CONFERENCE ROOMS. f) CLARIFY PLUMBING FIXTURE COUNT. DO YOU MEAN YOU HAVE 3 MEN'S RESTROOMS, 3 WOMENS RESTROOMS AND 3 ACCESSIBLE RESTROOMS? THE FLOOR PLAN HAS 11 RESTROOMS SHOWN. g) JUSTIFY SINGLE EGRESS FROM CENTRAL COURT AREA. THIS APPEARS TO BE AN ASSEMBLY AREA WITH AN OCCUPANT LOAD OVER 50. 3) PROVIDE DIMENSIONED FLOOR PLANS FOR RESTROOMS. PP A7.0 DOES NOT CLEARLY SHOW THAT REQUIRED CLEAR FLOOR SPACES PER ANSI117.1 HAVE BEEN MET. 4) DIMENSION ELEVATION DRAWINGS PP A7.0 TO SHOW COMPLIANCE WITH ANSI 117.1 5) COORDINATE BEAM SIZE & STRUCTURAL DESIGNATIONS ON PP A9.0 WITH STRUCTURAL PLANS. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/01/2011 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
09/01/2011 | SUE REEVES | REJECT SHELF | Completed |